My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
122016
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:38:46 AM
Creation date
12/14/2016 3:23:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2016
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bernal Avenue Bridge Painting— Federal ID 5101(028) <br /> Construction Services Proposal <br /> Page 2 of 3 <br /> Assumptions: <br /> • The project construction will not extend beyond September 30, 2017 <br /> • BCA will not need to attend the preconstruction meeting or make any site visits <br /> • The structural submittals listed above will be reviewed by Biggs Cardosa Associates, Inc <br /> • One re-submittal of each structural submittal listed above is anticipated in this scope of services <br /> • Civil related submittals, construction schedule submittals, and bridge painting submittals including <br /> the Contractor's waste characterization testing of the lead in the removed paint, and the air and <br /> soil monitoring results, will be reviewed by the City's painting inspection company or by City <br /> staff <br /> • RFI responses will only require a total of$3,800 (approximately 12 hours of an Engineering <br /> Manager, 12 hours of a Project Engineer, and 2 hours of an Associate) <br /> • Responding to RFIs and developing associated CCOs to address contractor errors, alternative <br /> construction method requests, or unforeseeable construction field issues(contractor scheduling, <br /> contractor equipment limitations, 3`d party coordination/limitations, undocumented existing <br /> conditions, etc)that could not typically have been anticipated during design development is not <br /> included in the scope of services but can be added as Extra Work Requests as required <br /> • QA monitonng of the Contractor's biologist is not included in this scope of services and will be <br /> performed by others <br /> • City will provide redline plan markups to BCA for creating the Record Drawings <br /> Should you have any questions, please do not hesitate to call <br /> Sincerely, <br /> BIGGS CARDOSA <br /> ASSOCIATES, INC <br /> 9114."/41 - <br /> John Alciati, PE <br /> Engineering Manager <br /> M\2013\122\101 Admin\110 Expend Ctrl\112 Prop-Contract-Amndmnt\Task Orders\Task 8_Bernal Painting <br /> CS\Pleasanton Task 8 BCA Bernal Painting CS Proposal docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.