My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
122016
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 11:38:46 AM
Creation date
12/14/2016 3:23:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/20/2016
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Scott Christie will be Swinerton's Resident Engineer/Senior Project Manager and your primary point <br /> of contact for this assignment Scott has extensive experience managing City projects as he comes to <br /> Swinerton after spending over 18 years as an Associate and Senior Engineer at a local East Bay city Scott <br /> has experience with bridge coatings in completing the City of San Pablo Rumrill Bridge Replacement <br /> project,which also was a Federally-funded project Scott will lead the Swinerton construction management <br /> and inspection services and be the main point of contact for project coordination,contractor oversight, <br /> schedule monitoring,change order management,and community outreach <br /> Mr.Todd Whittenburg,a certified coatings inspector,will provide the daily inspections and oversight for <br /> the bridge coating removal (abatement),bridge, railings,walkway and utility lines prep work,and coating <br /> application of all bridge surfaces (including utility lines) He will provide daily reports detailing each of the <br /> day's work and ensure that the work is completed in accordance with the contract documents,technical <br /> specifications and industry standards Todd is a sub-consultant with Bay Area Coating Consultants,which <br /> has approximately 25 certified inspectors and has worked with Swinerton before on the Alcatraz Water <br /> Tank Coating project Todd will assist Scott in the monitoring of the contractor's quantities for pay <br /> estimate requests and any force account work Todd will also ensure the contractor is in compliance with <br /> the project schedule,work hours,traffic control and pedestrian access per the contract documents <br /> I will provide general operational and management oversight,and professional services administration to <br /> ensure successful project delivery <br /> The attached Matrix of CM Tasks and Fee Proposal detail the breakdown of our time and costs for the <br /> project The Fee Proposal is $148,845,plus an allowance of$150 for reimbursables,such as reproduction <br /> and miscellaneous office supplies for project records Our total fee proposal is a not-to-exceed amount of <br /> $148.995. <br /> If you have any questions or require additional clarification,please do not hesitate to call me at(925) 270- <br /> 5636 Thank you for your consideration of this proposal <br /> Very truly yours, <br /> ,6Qt 5.Ad <br /> Bob Addiego,LEED®AP <br /> Project Executive <br /> CC Jeff Gee <br /> Myrna Wagner <br /> Scott Christie <br /> Adam Nelkie <br /> Attachment Cost Matrix for Bernal Avenue Bridge Painting <br /> Proposal for Model bid and special provisions update Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.