My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
106 The curb and gutter along the street shall have a subdrain installed at either the <br /> back of the curb or lip of gutter at the discretion of the City Engineer This detail <br /> shall be shown on the improvement plans Said drains shall be connected to the <br /> storm drain system or drained by other means acceptable to the City Engineer <br /> 107 All existing septic tanks or holding tanks, if any, shall be properly abandoned <br /> pursuant to the requirements of the Alameda County Department of Health <br /> Services prior to the start of grading operations, unless specifically approved by <br /> the City Engineer <br /> 108 The project developer shall submit detailed landscape and irrigation plans as part <br /> of the improvement plans The irrigation plan shall provide for automatic controls <br /> 109 The applicant shall post with the City, prior to approval of the subdivision map, a <br /> separate performance bond for the full value of all improvements that are not to be <br /> accepted by the City of Pleasanton <br /> 110 All retaining walls along the street shall be placed behind the Public Service <br /> Easement (PSE), unless otherwise approved by the City Engineer <br /> Livermore-Pleasanton Fire Department <br /> 111 The project developer shall keep the site free of fire hazards from the start of <br /> lumber construction until the final inspection <br /> 112 Prior to any construction framing, the project developer shall provide adequate fire <br /> protection facilities, including, but not limited to a water supply and water flow in <br /> conformance to the City's Fire Department Standards able to suppress a major <br /> fire <br /> 113 The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site <br /> fire mains and fire hydrant locations only Plan check comments and approvals DO <br /> NOT INCLUDE <br /> a Installation of the on-site fire mains and fire hydrants Specific installation <br /> drawings submitted by the licensed underground fire protection contractor shall <br /> be submitted to the Fire Prevention Bureau for approval <br /> b Backflow prevention or connections to the public water mains <br /> 114 Electrical conduit shall be provided to each fire protection system control valve <br /> including all valve(s) at the water connections The Livermore-Pleasanton Fire <br /> Department requires electronic supervision of all valves for automatic sprinkler <br /> systems and fire protection systems <br /> 115 Address numbers shall be installed on the front or primary entrance for all <br /> buildings Minimum building address character size shall be 12" high by 1" stroke <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 19 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.