Laserfiche WebLink
conditions of the project shall be certified in writing by the geotechnical consultant <br /> for conformance to the approved plans and geotechnical report and submitted to <br /> the City Engineer for review and approval prior to occupancy <br /> 99 The project developer shall construct vertical P C C curbs and gutters within this <br /> development unless otherwise approved by the City Engineer When the sidewalk <br /> is adjacent to the curb and gutter, they shall be poured monolithically <br /> 100 A sanitary sewer lateral with two-way cleanout (located at the back of the sidewalk <br /> or curb, whichever is applicable) shall be provided to each lot of record within the <br /> development unless otherwise approved by the City Engineer <br /> 101 All dry utilities (electric power distribution, gas distribution, communication service, <br /> cable television, street lights and any required alarm systems) required to serve <br /> existing or new development shall be installed in conduit, underground in a joint <br /> utility trench unless otherwise specifically approved by the City Engineer <br /> 102 Any damage to existing street improvements during construction on the subject <br /> property shall be repaired to the satisfaction of the City Engineer at full expense to <br /> the project developer This shall include slurry seal, overlay, or street <br /> reconstruction if deemed warranted by the City Engineer <br /> 103 The project developer and/or the project developer's contractor(s) shall obtain an <br /> encroachment permit from the City Engineer prior to moving any construction <br /> equipment onto the site <br /> 104 The project developer shall submit a final grading and drainage plan prepared by <br /> a licensed civil engineer depicting all final grades and drainage control measures, <br /> including concrete-lined V-ditches, to protect all cut and fill slopes from surface <br /> water overflow This plan shall be subject to the review and approval of the City <br /> Engineer prior to the issuance of a grading permit <br /> 105 All existing drainage swales that are filled shall have sub drains installed unless <br /> otherwise approved by the City Engineer and the developer's soils engineer All <br /> sub drains shall have tracer wire along entire length of the sub drains and <br /> cleanouts installed with metal cap at the beginning of the pipe and at locations <br /> needed for maintenance The end of the pipe shall terminate in a storm drain or <br /> other storm drain ouffall, subject to the approval of the City Engineer The project <br /> developer's engineer shall submit a final sub drain location map to the City <br /> Engineer prior to acceptance of the public improvements and/or project It shall <br /> be the responsibility of the property owner to relocate a sub drain, if during the <br /> excavation of a pool or other subsurface structure, a sub drain is encountered All <br /> property owners within the subdivision shall receive notice of the presence of these <br /> sub drains Said notice shall be reviewed and approved by the City Attorney prior <br /> to distributing the notice <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 18 of 30 <br />