Laserfiche WebLink
In all cases address numerals shall be of contrasting background and clearly <br /> visible in accordance with the Livermore-Pleasanton Fire Department Premises <br /> Identification Standards This may warrant field verification and adjustments <br /> based upon topography, landscaping or other obstructions <br /> 116 The following items will be provided prior to any construction above the foundation <br /> or slab NOTE Periodic inspections will be made for compliance <br /> a Emergency vehicle access will be required to be provided to the site (tract), <br /> including the area where construction is occurring <br /> b Emergency vehicle access shall be a minimum of 20 feet in clear width A clear <br /> height free of obstructions (power, cable, telephone lines, tree limbs, etc ) is <br /> required This clearance shall be a minimum of 13 feet-6 inches Inside turning <br /> radius of 45 feet and outside turning radius of 55 feet shall be provided <br /> c Buildings or portions of buildings or facilities exceeding 30 feet (9144 mm) in <br /> height, measured to the roof eave, above the lowest level of fire department <br /> vehicle access shall be provided with approved fire apparatus access roads <br /> capable of accommodating fire department aerial apparatus Fire apparatus <br /> access roads shall have a minimum unobstructed width of 26 feet in the <br /> immediate vicinity of any building or portion of building more than 30 feet (9144 <br /> mm) in height At least one of the required access routes meeting this condition <br /> shall be located within a minimum of 15 feet (4572 mm) and a maximum of 30 <br /> feet (9144 mm) from the building, and shall be positioned parallel to one entire <br /> side of the building <br /> d The carrying capacity of the access route(s) shall be 69,000 pounds under all <br /> weather conditions <br /> e Designated construction material storage and construction worker parking shall <br /> not obstruct the emergency vehicle access route(s) <br /> f On-site fire hydrants shall be in service Fire hydrants shall be flushed and all <br /> valves open <br /> Community Development Department <br /> 117 The project applicant/developer shall submit a refundable cash bond for hazard <br /> and erosion control The amount of this bond will be determined by the Director of <br /> Community Development The cash bond will be retained by the City until all the <br /> permanent landscaping is installed for the development, including individual lots, <br /> unless otherwise approved by the department <br /> 118 The project developer shall submit a written dust control plan or procedure as part <br /> of the improvement plans <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 20 of 30 <br />