My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
092016
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:08:00 PM
Creation date
9/15/2016 3:24:29 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/20/2016
DESTRUCT DATE
15Y
DOCUMENT NO
07
Document Relationships
07 ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\092016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
49. The applicant shall reconstruct any non -ADA- compliant and /or uplifted and <br />deficient sidewalk and curb and gutter along the project frontage identified prior to <br />the issuance of the first construction permit by the Building and Safety Division. <br />50. The City Engineer shall determine if the applicant shall be required to construct a <br />public sanitary sewer main within Parcel "A." <br />51. The applicant shall abandon all unused existing utility stubs in compliance with City <br />standards and specifications. <br />52. The applicant shall be responsible for the undergrounding of the overhead utility <br />lines across the project frontage on St. John Street. The undergrounding shall be <br />completed prior to the first final inspection by the Building and Safety Division for <br />any of the lots. All utility lines shall be installed in conduit. Only PG &E switch <br />enclosures or capacity banks can be installed above ground provided the units are <br />screened with landscaping to the satisfaction of the Director of Community <br />Development. <br />53. The applicant shall install slurry seal on St. John Street from lip of gutter to street <br />centerline, after completion of utility undergrounding and frontage improvements, <br />prior to the acceptance of improvements. <br />54. All landscaping within the public right -of -way along the project's frontage shall be <br />maintained by the homeowners /maintenance association unless otherwise <br />approved by the City Engineer. Necessary irrigation system, irrigation water <br />meter, irrigation valves, irrigation controller, etc. shall been included on the final <br />map plan. <br />55. The parcel of the relocated existing house shall be part of a drainage management <br />area. The drainage management area shall be shown on the building permit <br />grading plans submitted to the Building and Safety Division for plan check and <br />permit issuance and shall be subject to the review and approval of the City <br />Engineer prior to issuance of building permits. <br />56. The applicant shall submit Engineering Services sanitary sewer demand, water <br />demand, and hydraulic and hydrologic calculations with the Improvement Plans <br />stamped and signed by a California Registered Civil Engineer. <br />57. All required faithful performance bonds and labor materials bonds (security bonds) <br />in a penal amount equal to 100 percent of the approved estimates of construction <br />costs of improvements shall be submitted to and approved by the City prior to <br />approval of the Final Map or issuance of the Building or Grading Permit, whichever <br />comes first. <br />58. The applicant shall provide as -built drawings in AutoCAD 2010 or PDF prior to the <br />release of the security bonds. <br />P16 -1201, P16 -1202 & PUD -120, Catalyst Development City Council <br />Page 11 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.