My WebLink
|
Help
|
About
|
Sign Out
WORKSHOP REPORT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
091316
>
WORKSHOP REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2016 1:08:25 PM
Creation date
9/8/2016 3:13:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/13/2016
DESTRUCT DATE
15Y
Document Relationships
WORKSHOP ATTACHMENT 3
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
WORKSHOP AGENDA
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
WORKSHOP ATTACHMENT 1 AND 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
WORKSHOP ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
111 � I S � 1 <br /> A.Al <br /> ..- .i_--- y �L� .� <br /> - <br /> yr g 4+ li LN� :�► .� 's - <br /> 1 I a, <br /> ,IteDanaidt <br /> Long-term <br /> Widening the underpass to provide protected bike lanes and complete the protected <br /> intersection design is the long-term improvement. This design would need to construct <br /> a third northbound lane to accommodate heavy vehicular right turn volumes from <br /> Stanley Boulevard onto Valley Avenue. Reconstructing the north east corner to improve <br /> sight distance for pedestrians and marking the north and east sides of the intersection <br /> to allow for pedestrian is part of the long-term design. <br /> Stanley Boulevard at Valley Avenue/Bernal Avenue intersection is identified in the <br /> General Plan as a Gateway intersection. In the AM and PM peak hours, this <br /> intersection operates at level of service D due to heavy inbound and outbound traffic. <br /> This volume has decreased with the opening of Stoneridge Drive. Prior to the opening <br /> of Stoneridge Drive there were over 1,200 AM westbound right turns. Today there are <br /> slightly less than 1000. Similarly, in the PM the extension of Stoneridge Drive has <br /> reduced the southbound left turn by more than 100 vehicles (currently 900 PM <br /> southbound left turns). Although it is a Gateway intersection, significant changes to <br /> roadway capacity can lead to congestion that could increase collisions. <br /> Estimated Fiscal Impact of StanleyNalleyBernal Improvements <br /> Funding sources have not been identified for any of the aforementioned intersection <br /> improvements. Staff estimates that the costs for the near-term and medium-term <br /> improvements could look something like those shown in the chart on the following page. <br /> Page 15 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.