My WebLink
|
Help
|
About
|
Sign Out
WORKSHOP REPORT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
091316
>
WORKSHOP REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2016 1:08:25 PM
Creation date
9/8/2016 3:13:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/13/2016
DESTRUCT DATE
15Y
Document Relationships
WORKSHOP ATTACHMENT 3
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
WORKSHOP AGENDA
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
WORKSHOP ATTACHMENT 1 AND 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
WORKSHOP ATTACHMENT 4
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\091316
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Near-term: <br /> Green bike lanes area cost <br /> west bike crossing 750 SF $ 4,500.00 <br /> south bike crossing 570 SF $ 3,420.00 <br /> northbound bike lane 900 SF $ 5,400.00 <br /> eastbound bike lane 2000 SF $ 12,000.00 <br /> southbound receiving bike lane 450 SF $ 2,700.00 <br /> Total green bike lanes 4670 SF $ 28,020.00 <br /> Wavfinding signs/sidewalk legend <br /> Stanley to Boulder 10 ea $ 2,500.00 <br /> Boulder to Busch 10 ea $ 2,500.00 <br /> $ 5,000.00 <br /> Near-term Grand Total' $ 33,020.00 <br /> Medium-term: <br /> Green bike lanes <br /> north to south bike crossing 750 SF $ 4,500.00 <br /> new crosswalk striping 250 SF $ 1,000.00 <br /> new bike path 1200 SF $ 18,000.00 <br /> new northbound bike ramp 1 EA $ 3,000.00 <br /> directional signage for path 10 EA $ 2,500.00 <br /> removal of SE island 1 EA $ 5,000.00 <br /> concrete curb for protected intersection 1000 LF $ 65,000.00 <br /> concrete Islands for protected intersection 2200 SF $ 30,800.00 <br /> storm drain relocation 2 EA $ 20,000.00 <br /> reflectors and signs 10 EA $ 1,000.00 <br /> traffic control 1 IS $ 10,000.00 <br /> Medium-term Grand Total' $160,800.00 I <br /> In order to establish a cost estimate for long-term improvements, a consultant would <br /> need to be hired to execute a detailed design of the intersection improvements. A very <br /> rough preliminary estimate indicates the cost would be more than $1 million. <br /> Page 16 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.