City of Pleasanton DRAFT <br /> Recycled Water Infrastructure Expansion Phase 1A Design of Additional Improvements <br /> o Designing equipment and enclosure foundation and anchorage and submitting <br /> calculations for these items stamped by a licensed structural engineer;City will be <br /> responsible for review of these calculations <br /> o Complying with applicable codes in design of the package system <br /> o The manufacturer will be the Responsible Engineer for the packaged system design, <br /> including professional stamping and signature. <br /> • Pump station manufacturer will provide control strategy and P&ID for the packaged system. <br /> • The City will coordinate power service requirements with PG&E, based on power requirements <br /> provided by the equipment manufacturers. <br /> • No significant design changes will be directed by the City after completion of the 75%design <br /> effort. <br /> • Drawings and specifications for booster pump station and required site modifications will be <br /> supplement the contract documents for the Phase 1A project. <br /> • Supplemental specifications for commodity items(conduit,wire, meter panel, miscellaneous <br /> instruments)will be incorporated on the drawings <br /> • Development of Title 24 compliance forms is not included. <br /> • Power is available along Parkside Drive. Project will include a conduit run from power pole to <br /> booster station site and will utilize existing spare conduit installed with Phase 1A pipeline. <br /> • Booster station site is at the south end of the Arroyo Mocho pipeline crossing,south of the <br /> paved parking lot and on existing turf grass. <br /> • Booster station will visually screened within a fence(PVC coated chain link with green PVC slats) <br /> with gate access. <br /> • All packaged equipment will be in manufacturer-provided weather-proof enclosures within the <br /> fenced site perimeter. <br /> • 3 phase power at proper voltage for pumping equipment is available from a local transformer <br /> vault or service box along Parkside Drive. <br /> • It is assumed the surge control requirements can be incorporated into the packaged pump <br /> system (manufacturer responsibility)and not require additional design by RMC <br /> • City will submit power service application to PGE and pay the required fees to initiate PG&E <br /> engineering work. <br /> • Standby power for pumping is not required <br /> • Provisions will be included for plugging in a portable generator <br /> • City will provide control panel and programming, radio or other telemetry to SCADA and all <br /> wiring and incidental materials and work for an operable booster pump station <br /> • RMC design will land field instrument cables to a common terminal strip to be used by City's <br /> panel manufacturer for landing signals to the panel <br /> • City will provide panel dimensions and weights. It is assumed that the panel can be incorporated <br /> in to the package manufacturer's skid in the field,without design of separate support. <br /> • Survey of site not required. City GIS mapping and Phase 1A mapping will be used for site <br /> development design <br /> • Scope does not include landscaping or irrigation system improvements <br /> • Scope does not include construction phase support,which would be defined under an additional <br /> amendment. <br /> Scope of Work 4 <br />