My WebLink
|
Help
|
About
|
Sign Out
04
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
081616
>
04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 10:47:37 AM
Creation date
8/10/2016 2:43:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/16/2016
DESTRUCT DATE
15Y
DOCUMENT NO
04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton DRAFT <br /> Recycled Water Infrastructure Expansion Phase 3A Design of Additional Improvements <br /> • Manufacturer of packaged system will provide package drawings in AutoCAD format and details <br /> regarding mechanical and electrical connections. <br /> Schedule <br /> RMC will execute the work to meet the following schedule for milestones: <br /> Milestone Weeks from NTP <br /> Initial Hydraulics TM 2 <br /> Surge Analysis TM 4 <br /> 90%Design Submittal 8 <br /> Change Order package Submittal 11 <br /> Budget <br /> The budget for this project is attached and summarized below: <br /> Task 12: Tassajara Reservoir Altitude Valve Retrofit: $10,679 <br /> Task 13:Sports Park and South Extension Booster Station: $74,687 <br /> Scope of Work 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.