My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:52:24 PM
Creation date
7/13/2016 9:16:53 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFP /or Update lo Don /loom Specific Plan <br />pLEASANTON. <br />Submittal Requirements <br />Interested consultants should submit qualifications that address the following: <br />1. Project Description. A brief description of your understanding of the overall project. <br />2. Approach to Project. Describe the manner and methods you will use to manage and <br />facilitate the work. This should include a discussion of how each of the separate tasks <br />will be approached, the individual primarily responsible for each task, and the expected <br />number of hours allocated to each task. <br />3. Scope of Work. Provide a scope of work that responds to the scope identified above. <br />4. Consultant Description of Qualifications. For your firm (and any subconsultants) <br />provide: <br />a. Firm qualifications and resume(s) of participating individual(s); and <br />b. A description of your experience completing updates to downtown specific plans <br />for mid -size jurisdictions. <br />5. Cost. Provide a cost proposal for the overall effort, including optional additional <br />meetings. Include the basis and assumptions made for estimated costs. Include hourly <br />rates for each task and each staff person assigned to that task, your hourly rates for this <br />project, and total number of hours. Clearly indicate the subtotaled cost for each task to be <br />performed by your fine and by any sub - consultants, and total cost for your work effort. <br />The cost proposal should also include a brief concept scope for California Environmental <br />Quality Act (CEQA) analysis and transportation modeling /analysis, including which <br />consultants would do this work (the proposal should not include a budget for CEQA and <br />transportation modeling /analysis work). <br />6. Schedule. Provide a detailed schedule /timeline indicating timeframes for draft <br />documents and reports, review by City staff, and final documents prior to release to the <br />public. <br />7. Conflict of Interest. Identify any recent, present, or proposed work undertaken by the <br />consultant, any subcontractor or subsidiary, or any other type of business or other <br />relationship, that could represent a potential, real, or perceived conflict of interest with <br />respect to this project. A conflict of interest could potentially, for instance, include <br />current work under contract to a landowner or developer within the Pleasanton sphere of <br />influence. <br />8. References. Please provide a list of at least three references for projects of similar scope <br />completed by your firm. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.