Laserfiche WebLink
1. Project Description and Approach <br />Initial review of the nronosed nroiect changes indicates that additional CEOA analysis is required to <br />confirm that no additional or substantially more severe significant imnacts would result from the project <br />change, as described further below. <br />Task 1. Project Initiation and Site Visit <br />In addition to meeting with City staff for a project kick -off meeting, ESA will review the Administrative <br />Draft General Plan Amendment and Zoning Amendment, as provided by the City, and will request data <br />vital to the project in electronic format, including but not limited to, any updated information concerning <br />ongoing investigation and remediation of contaminated soil and groundwater at the former Clorox <br />campus. ESA will begin the environmental and regulatory setting portions of the SEIR, and will inform <br />the City of any environmental constraints that arise during that work that could help to shape the proposed <br />project (i.e., make it a self - mitigating project). <br />ESA will coordinate a visit for key personnel to the project site and surrounding environs during which <br />time ESA will photograph the site and the surrounding area to document existing conditions. <br />Task 2. Notice of Preparation (NOP) <br />Although an NOP is not required for a Supplemental EIR, should the City desire to issue one, ESA will <br />prepare a NOP for review and revision by City staff. The NOP will conform to CEQA Guidelines <br />Sections 15082 and 15375, which require that at a minimum, a NOP include a project description, a <br />location map. and a summary of the potential environmental effects of the project. ESA will file the NOP <br />with the State Clearinghouse, and provide three hard copies to the City and digital copies. Comments <br />received on the NOP will be taken into consideration in determining which topics to analyze in the SEIR. <br />Task 3. Administrative Supplemental Environmental Impact Report (SEIR) <br />The analysis in the SEIR will evaluate the effects of the project compared to an existing baseline (to be <br />established, generally, at the time a NOP is issued for the SEIR). Because this document will supplement <br />the previously prepared. the analysis will evaluate whether implementation of the Johnson Drive <br />Economic Development Zone would result in any new or substantially more severe impacts than those <br />identified in the prior General Plan and GPA EIRs. whether due to changes in the project. changes in <br />circumstances, or the availability of new information. Because the previous EIRs — particularly. the GPA <br />EIR —are relatively recent, we anticipate that changes to the project (i.e_ implementation of the general <br />plan amendment and rezoning for the Johnson Drive site) would likely be the cause of new and/or more <br />severe impacts, should any be identified. <br />ESA will prepare a SEIR including a robust technical analysis of the identified key environmental issues. <br />Based upon the RFP, for the purposes of this proposal ESA assumes that four issues — Aesthetics. Air <br />Quality, Noise, and Transportation —will be fully analyzed in the SEIR, with the remainder of the <br />environmental topics on the CEQA Checklist assumed to be discussed in lesser detail, in a separate <br />section of the document. Mitigation measures from the General Plan EIR and/or GPA EIR will be <br />reviewed for the applicability to the proposed Johnson Drive project. <br />revised scope of work Includes cuff hours m update the SEIR project deswiution and associated <br />technical analivis comnloted to-date with the current nroieordesorimtiunj <br />As set forth in the RFP, ESA will provide the City with €rve-(-5)thirtv -five (35) printed copies of the <br />ADEIR. as well as one unbound copy and an electronic copy. <br />CO 0, Pleasanton Joimson Orin Eoonont Devebpment Zone SR 2 <br />