My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
071916
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2016 4:28:00 PM
Creation date
7/13/2016 8:50:34 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Approach <br />Based on our review of the Request for Proposals, we have put together a scope of work that we believe <br />responds to the City's objectives. This scope details the tasks that ESA proposes to complete and deliver a <br />Supplemental EIR Environmental Impact Report (SEIR). which would focus in on three key <br />environmental issue areas, and would be tiered from the 2009 General Plan EIR and the 201 1 GPA EIR. <br />The City. as Lead Agency, may prepare a supplement to an EIR if only minor additions or changes would <br />be necessary to make the previous EIR adequately apply to the project in the changed situation. The SEIR <br />need only present the information necessary to make the previous EIR adequate for the project as revised. <br />Thus. for purposes of the current SEIR. the project will consist of funher amendments to the Pleasanton <br />General Plan, previous amendments to which were analyzed in the GPA EIR. <br />The SEIR will be given the same kind of notice and public review as is given to a Draft EIR (CEQA <br />Guidelines Section 15087), and may be circulated by itself without re- circulating the previous Draft or <br />Final EIR. However. when the City decides whether to approve the proposed project, the decision - making <br />body shall consider the previous EIR as revised by the SEIR. A finding under Section 15091 shall be <br />made for each significant effect shown in the previous EIR as revised. <br />In December 2015. after circulation of the Draft SEIR. the City indicated that a minor chance to the <br />proposed Economic Development Zone (proposed proiect) will be incorporated into the Response to <br />Comments document and Final SEIR-Revised SEIR Table 3 -2. below. summarizes these changes. <br />REVISED TABLE 3 -2 <br />SUMMARY OF EDZ DEVELOPMENT CHARACTERISTICS <br />Existing 1 Phase 1 Development <br />Development (Parcels 6, 9, and 10) <br />Land Use or Other Characteristic <br />Unit <br />Full Buildout1 <br />Employees Jobs <br />369 <br />38,903 <br />f— 642 1.149 <br />General Retail Square Feet <br />62.40243 903 <br />246449227.940 <br />Club Retail } Square Feel <br />148.000 <br />148.000 <br />Commercial Service <br />Square Feel <br />123,165 <br />123,165 <br />- <br />Office <br />Square Feel <br />15.070 <br />15.070 <br />• <br />Industrial <br />Square Feet 27.5503 <br />27.550 <br />27,550 <br />Hotel <br />Institutional/Religious 1 <br />Square Feel <br />Square Feet <br />- <br />20,000 <br />68;000132.0004 <br />1 88 000132 000' <br />20.000 <br />- <br />Total new gross building space <br />1 Square Feet <br />- 1 t 260400285.000 266,303310.802 <br />Total gross building space <br />Square Feet <br />224,688 484x188§92 00 609,980635.490 <br />1 Inclusive of al phases of development including Phase 1. <br />2 Includes 100% et population and 50% of employment. <br />3 Dom net atdude square footage of structures demolished independently of the proposed EDZ <br />4 231 rooms (previously 140 rooms) <br />At • Acres <br />SF = Square Feet <br />SOURCE. Appendix (Brion & Associates, 2015). <br />City of Pleasanton Johnson Drive Ecdnmx Devebpmem Zone EIR 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.