Mr. Mike Tassano <br />November 4, 2015 <br />Page 2 of 3 <br />SCOPE OF WORK <br />FEHR''PEERS <br />Task 1— Prefirnfnacy Engineering <br />Using available aerial mapping, any available topographic mapping, and the preliminary interchange <br />design concept prepared by Fehr & Peers, MTCo will develop up to two (2) geometric alternatives for <br />vehicular roadway improvements along Stoneridge Drive and on the westbound to northbound 1 -680 <br />on -ramp, MTCo will develop a minimal design alternative which will minimize cost and impacts and <br />will require Cattrans approval of design exceptions, including ramp metering exceptions. MTCo will <br />also prepare an alternative that meets all feasible design standards including ramp metering for 2 <br />mixed flow lanes and HOV bypass, which is the current Caltrans requirement <br />Using available data from the JEDZ transportation impact study, Fehr & Peers will estimate ramp <br />metering queues to inform the design. As part of this task MTCo will identify the need for and <br />feasibility of widening the bridge. Ramp modifications will be designed to avoid shifting the ramp <br />gore -point north if possible, recognizing the potential adverse impacts such a ramp modification <br />would have to mainline I -680 operations due to the proximity of the 1-580/I -680 interchange. <br />MTCo will prepare geometric layouts at 1' = 50' scale on readily available open source orthorectified <br />aerial mapping. MTCo will prepare horizontal layout and prepare typical cross sections. This scope <br />assumes widening only and no changes to roadway or ramp profile. <br />In addition to the vehicular roadway design alternatives. MTCo and Fehr & Peers wilt work with the <br />City to develop up to three bicycle route alternatives (Class! and Class 11), considering guidance in the <br />rTE publication Recommended Design Guidelines to Accommodate Pedestrians and Bicycles at <br />Interchanges (April 2014). guidance from the City's Bicycle Master Plan (update currently underway), <br />and our understanding of Caltrans complete streets and Highway Design Manual guidelines. <br />MTCo will prepare preliminary construction cost estimates for each of the alternatives based upon <br />Caltrans 6 -page format MTCo will include construction cost estimates for roadway, structural, right <br />of way and support costs for each roadway alternative. Cost estimates for bicycle route alternatives <br />will be prepared to identify the marginal cost of each altemative so that the selected bicycle route <br />may be added to the selected roadway alternative to understand the likely total project budget. <br />Deliverables <br />• Geometric Layouts (2 alternatives) at 1'=50' scale <br />• Bicycle Route Layouts (3 alternatives) at 1 " =50' scale <br />• Project Budget Estimates (Caltrans 6 -page format) 1 per alternative per above <br />