My WebLink
|
Help
|
About
|
Sign Out
21
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
041916
>
21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:23:13 PM
Creation date
4/13/2016 2:00:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/19/2016
DESTRUCT DATE
15Y
DOCUMENT NO
21
Document Relationships
21 ATTACHMENT 5
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\041916
21 ATTACHMENT 5-2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\041916
21 ATTACHMENT 6 AND 7
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\041916
21 ATTACHMENT 8
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2016\041916
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT DESCRIPTION <br />The applicant, Ponderosa Homes, proposes to demolish the existing residence built in <br />the 1950s and accessory buildings, and construct 19 single - family homes and related <br />improvements. The requested entitlements include a Growth Management Agreement, <br />Affordable Housing Agreement, and a Development Agreement which would expire on <br />or around August 2034. <br />The 19 -lot residential development is summarized below: <br />Range of Lot Sizes: 9,881 sq. ft. — 18,913 sq. ft. <br />Range of Home Sizes (living area): 3,937 sq. ft. — 4,458 sq. ft. <br />Range of Garage Sizes: 650 sq. ft. — 847 sq. ft. <br />Range of floor area ratios (FARs)': 23%-45% <br />Building Heightz: 32 ft. <br />Floor area ratio is one measure of building mass (square footage of a structure divided by the <br />size of the lot). Proposed FARs includes garage area over 600 sq. ft. <br />2 Building height is measured from the lowest finished grade adjacent to the house to the <br />highest point of the roof excluding chimneys. <br />The proposed 19 -lot residential development would be constructed in two phases. Lots <br />1 -16 would be developed soon after project approval. Lots 17 -19 would be developed <br />when the driving range ceases operation. Please refer to "Golf Ball Net/Structure and <br />Visual Simulations," below, for a discussion of the proposed golf ball net that would <br />remain in place until the initiation of Phase 2. The project details are described in more <br />detail in the attached Planning Commission staff report (Attachment 6). There are no <br />major changes to the proposed PUD development plan that was reviewed by the <br />Planning Commission. Figure 2 shows the project site and phasing plan. <br />Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.