My WebLink
|
Help
|
About
|
Sign Out
NOTICE OF WORKSHOP
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
041216
>
NOTICE OF WORKSHOP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:29:34 PM
Creation date
4/1/2016 4:37:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/16/2016
DESTRUCT DATE
15Y
DOCUMENT NO
NOTICE OF WORKSHOP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.Project Description <br /> and future development phases. "Full Buildout"as presented in Table 3-2 and analyzed in this <br /> SEIR, includes Phase I assumptions as well as future development phases,and represents the <br /> maximum assumed level of development within the entire EDZ area. <br /> TABLE 3-2 <br /> SUMMARY OF EDZ DEVELOPMENT CHARACTERISTICS <br /> Existing Phase I Development <br /> Land Use or Other Characteristic Unit Development (Parcels 6,9,and 10) Full Buildoutl <br /> Employees Jobs 369 642 1,149 <br /> General Retail Square Feet 38.903 62,403 246.440 <br /> Club Retail Square Feet - 148,000 148,000 <br /> Commercial Service Square Feet 123,165 123,165 - <br /> Office Square Feet 15,070 15,070 - <br /> Industrial Square Feet 27,5503 27.550 27,550 <br /> Hotel Square Feet - 88,000 88,000 <br /> Institutional/Religious Square Feet 20,000 20.000 - <br /> Total new gross building space Square Feet - 259,500 285,302 <br /> Total gross building space Square Feet 224,688 484,188 509,990 <br /> 1 Inclusive of all phases of development,including Phase I. <br /> 2 Includes 100%of population and 50%of employment. <br /> 3 Does not include square footage of structures demolished independently of the proposed EDZ. <br /> Ac=Acres <br /> SF=Square Feet <br /> SOURCE:Appendix C(Brion&Associates,2015). <br /> Phase I Development Assumptions: Parcels 6, 9, and 10 <br /> During Phase I development of the EDZ, club retail uses could be developed on Parcel 6,and a <br /> select service hotel (a hotel that would provide certain dining and other specific services and <br /> amenities)and other general retail uses would be developed on Parcels 9 and 10. <br /> Parcel 6 would be developed with up to 148,000 square feet of club retail uses, with building <br /> heights up to 40 feet, and associated uses, which may include a gas station. Parking for up to 800 <br /> vehicles and landscaping and site improvements, including bio-retention areas to manage on-site <br /> stormwater runoff and trees planted throughout the parcel to provide shading and visual screening <br /> around the perimeter,could also be developed on this parcel. <br /> Parcels 9 and 10 could be developed with up to 88,000 square feet of hotel uses, with building <br /> heights up to 55 feet. Up to 23,500 square feet of general retail uses could also be developed on <br /> these parcels. Hotel and general retail uses would be surrounded by landscaping,and a <br /> landscaped buffer would be provided between each building and Johnson Drive. <br /> Johnson Drive Economic Development Zone 3-8 ESA/140421 <br /> Draft Supplemental EIR September 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.