Laserfiche WebLink
3.Project Description <br /> For Phase 1, it is assumed construction equipment and materials would be"staged" (stored and <br /> used)on each site as development takes place. Figures 3-4 and 3-5 present conceptual plans for <br /> Phase I of development. As part of the proposed EDZ,the parcels would be re-zoned Planned <br /> Unit Development Commercial (PUD-C). <br /> Full Buildout Development Assumptions <br /> During future phases after the development of Parcels 6,9 and 10 under Phase I, it is assumed the <br /> other parcels within the EDZ would be redeveloped with types and intensities of uses consistent <br /> with fiscal projections recently prepared for the EDZ area and presented in Appendix C. Full <br /> buildout would include development as described for Phase I, and would include the development <br /> of up to 246,440 square feet of general retail uses, up to 148,000 square feet of club retail uses, up <br /> to 27,550 square feet of industrial uses, and up to 88,000 square feet of hotel uses, for a total of <br /> up to 509,990 square feet of uses. These later phases are assumed to take place over several years. <br /> No specific development activities are presented or analyzed in this SEIR at the level of detail <br /> that specific uses and locations are assumed for Phase I as described above. <br /> Design Guidelines <br /> The City has prepared Draft Design Guidelines for the EDZ(Design Guidelines), included in <br /> Appendix D. The purpose of the Design Guidelines is to provide urban design guidance at the <br /> planning application stage in order to achieve appropriate development for all uses within the <br /> EDZ. The Design Guidelines allow for the future development and redevelopment of the EDZ <br /> area in a way that is comprehensive and characterized by high-quality design, and that provides <br /> adequate landscaping and transportation access. The Design Guidelines provide direction on <br /> building height and setbacks, landscaping, parking supply, open spaces, building types and <br /> architectural features. All signage within the EDZ area would be subject to the Design <br /> Guidelines. <br /> Utilities and Infrastructure <br /> The EDZ area is currently served by water, sanitary sewer, stormwater, and other infrastructure. <br /> Development permitted under the EDZ may include upgrades to this infrastructure as needed to <br /> accommodate potential future development, as discussed further in Section 4.E, Other Topics, of <br /> this SEIR. The EDZ area is also served by the city's transportation network. The assumed level of <br /> development under the EDZ may require potential upgrades to the transportation network, as <br /> discussed further in Section 4.D., Transportation and Traffic,of this SEIR. <br /> Johnson Dnve Econarnc Development Zone 3-9 ESA 1 140421 <br /> Draft Supplemental ER September 2015 <br />