Laserfiche WebLink
DISCUSSION <br /> Several aspects of this project will improve circulation and safety in the area, including: <br /> 1. Controlled Access: The traffic signal will allow controlled access in and out of the <br /> driveways, eliminating the need for drivers to find acceptable gaps in traffic during <br /> the congested school commute times. <br /> 2. Narrowed North Driveway and New Sidewalk: The north driveway will be <br /> narrowed slightly and a new concrete sidewalk will be installed along the north <br /> side of the parking lot. This will slow traffic entering the parking lot, and provide a <br /> pedestrian path of travel from the public street to the school buildings. PUSD has <br /> agreed to pay for the construction of this sidewalk through a separate <br /> reimbursement agreement (see "Budget & Cost Sharing" discussion below). <br /> 3. Reconstruction of Entrances/Intersections: The project will include a complete <br /> reconstruction of the two driveways. This reconstruction will change the <br /> appearance so that the entrances and exits will resemble a roadway entrance <br /> design (instead of a driveway entrance design). This modification will allow more <br /> efficient movement of vehicles into and out of the parking lot and also provide an <br /> additional visual queue to pedestrians that they are crossing a signalized <br /> intersection. <br /> Design <br /> The north driveway will continue to serve as the <br /> primary entrance allowing inbound traffic only. <br /> The left turn pocket on northbound Santa Rita ti S !/ <br /> 0 <br /> Road will be extended to allow for greater 1� <br /> storage of vehicles. Because the north driveway N° T"°"'vwA� <br /> is inbound only, the northbound through traffic <br /> will always have a green signal indication and '14 ► -i A'; <br /> southbound will only have to stop to allow the #0," , ze <br /> northbound left turn into the parking lot. <br /> / <br /> The middle driveway will be widened to add an e• <br /> additional outbound left turn lane. The southern <br /> � 4 <br /> driveway will remain as it is currently designed <br /> as a right turn exit only. c+0 <br /> The traffic signal installation will install some of A <br /> the poles and other equipment in the school ■ <br /> property to keep the sidewalk clear for ' <br /> pedestrians. Pleasanton Unified School District ,°4,-1 7,- <br /> will be granting the City an easement for the 7s, `ts.` ; <br /> traffic signal equipment installation. <br /> Schedule 014' <br /> To expedite the project delivery and avoid a ,o f°RIVE <br /> M R CI� ;Qf Y. <br /> potential signal pole delivery delay, the City has s <br /> initiated an advanced purchase for the traffic 4 <br /> Page2of3 , + <br />