My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
031516
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:22:41 AM
Creation date
3/10/2016 11:22:37 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/15/2016
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Matt Gruber,City Landscape Architect <br /> RE: PLEASANTON TENNIS AND COMMUNITY PARK/proposal for landscape design services <br /> March 2,2016 <br /> Page 2 <br /> 2.0 DESIGN DEVELOPMENT <br /> 2.01 Design Development Plans—35%Submittal:Based on the comments received during the <br /> schematic design phase,develop design development plans to a 35%level of completion. For <br /> purposes of this proposal and estimate of fees we assume the addition of courts 11 and 12 only. <br /> All drawings shall be prepared in AutoCAD. Package to include: <br /> a. title sheet <br /> b. demolition plan <br /> c. erosion control plan <br /> d. grading and drainage plan <br /> e. stormwater control plan <br /> f. site construction plan <br /> g. irrigation plan <br /> h. planting plan <br /> i. electrical plan <br /> j. construction details <br /> k. outline technical specifications(City to prepare front end specs) <br /> 2.02 Updated Cost Estimate: Prepare an updated construction cost estimate. Estimate will be <br /> broken down by individual construction items and include area take offs,quantities, unit prices <br /> contingencies,etc. <br /> 2.03 Steering Committee Meeting#2:Allow for a meeting with the City, Lifetime Tennis and others <br /> as warranted to review the 35%submittal plans. Prepare a written meeting summary <br /> documenting decisions made. <br /> 3.0 CONSTRUCTION DOCUMENTS <br /> 3.01 Construction Documents—90%Submittal:Based on the comments received from the above <br /> meetings and the analysis of other items,develop construction documents to a 90%(final draft) <br /> level of completion. Package to include all documents noted in task 2.01 plus; <br /> I. Technical specifications with measurement and payment clauses <br /> m. bid form <br /> n. engineers estimate in bid format <br /> Provide four(4)sets of full size plans. Provide electronic files for the plans and specifications in <br /> AutoCAD and MS Word formats. <br /> 3.02 Draft Bid Form:Prepare a draft bid form. Bid form will be broken down by pay item,including <br /> quantities and unit prices. <br /> 3.03 City Review Meeting:Allow for a final meeting with the Steering Committee to review the 90% <br /> submittal plans. Prepare a written meeting summary documenting decisions made. <br /> P2523 Proposal 2016 02-29 <br /> ©copyrighted 2014 Callander Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.