My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
030116
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 3:53:53 PM
Creation date
2/25/2016 3:53:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Fire Station 2/3 Proposal <br /> January 25, 2016 <br /> Page 3 <br /> ▪ Develop conceptual plans for temporary facilities during the course of <br /> construction for both station sites. <br /> Develop preliminary Cost Estimates based upon building systems. The <br /> estimates prepared at this phase will be generally square foot cost <br /> estimates for the various building components, and will include a design <br /> development contingency (to allow for potential increases as the design is <br /> refined further in the later stages of the project). Cost estimates will <br /> include required modifications for Station 2 and either modifications or the <br /> demolition and replacement of Station 3. <br /> ▪ Prepare a design narrative describing the feasibility of the design <br /> approach for both stations, including Architectural, Civil, Electrical, <br /> Structural, and Mechanical engineering as well as descriptions of <br /> proposed landscape design approach. Develop preliminary needs <br /> assessment report to include existing conditions analysis, proposed floor <br /> plan modifications and preliminary cost estimates <br /> ▪ Make required submissions to City for preliminary report review and <br /> comments. <br /> - Make corrections and adjustments to incorporate City comments and <br /> make final presentation to City Council to present report findings. <br /> • For the Concept Design Phase we have included three coordination <br /> meetings at a desired location with selected City staff and stakeholders. <br /> - At the conclusion of the Needs Assessment Phase a proposal will be <br /> provided for the additional services required to provide complete <br /> construction documents for the approved improvements. <br /> ADDITIONAL SERVICES TO BE PROVIDED ON AN HOURLY BASIS <br /> The following items are not included in the Basic Services, and will be provided <br /> as additional services only after written authorization is received. Unless a <br /> subsequent fixed fee proposal is provided, the work will be done on an hourly <br /> basis per the attached Hourly Rate Schedule. <br /> 28o Bettencourt Street Sonoma, CA 95476 <br /> www.jeffIcatzarchitecture.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.