My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
030116
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 3:53:53 PM
Creation date
2/25/2016 3:53:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pleasanton Fire Station 2/3 Proposal <br /> January 25, 2016 <br /> Page 4 <br /> Additional Services not included in our basic scope of work include: <br /> • Schematic Design, Design Development, Construction Documents, <br /> Bidding and Construction Administration services <br /> • Geotechnical Engineering Services <br /> - Revisions to Needs Assessment Report resulting from Owner requested <br /> changes to documents previously approved by the Owner, or due to code <br /> or zoning changes made subsequent to Owner approval. <br /> Services required because of significant changes in the project (not due to <br /> the design team's acts or omissions) including, but not limited to, size, <br /> quality, complexity, schedule, or the method for bidding and contracting for <br /> construction. <br /> • Processing change requests for Owner requested changes, and for <br /> unforeseen site conditions, after bid, including revisions to Contract <br /> Documents, processing approval of revisions through the Building <br /> Department, and Change Order negotiation. <br /> • Services in conjunction with any required discretionary approvals. <br /> • Preparation of Boundary Surveys, ALTA Surveys, Title Reports, Deeds, <br /> construction staking or other documents in conjunction with the project <br /> site. <br /> • Providing Phase One Environmental services for Soils contamination <br /> survey and remediation. <br /> • Preparation of documentation to process the project through the US <br /> Green Building Council as a LEED project. <br /> ▪ Design of photo-voltaic electrical generation systems. <br /> • Plan check and permit fees (if paid by the consultant) will be a <br /> reimbursable expense, charged at 1.1 times the Consultant's cost. <br /> - All delivery, printing and reproduction costs will be a reimbursable <br /> expense, charged at 1.1 times the Consultant's cost. <br /> 28o Bettencourt Street Sonoma, CA 95476 <br /> www jeffkatzarchitecture.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.