Laserfiche WebLink
RMC will evaluate the capital needs associated with connecting the land use parcels within <br /> the Happy Valley study area to the City of Pleasanton collection system. <br /> Subtask 3.1 Evaluate New Facilities <br /> • Determine sizing and alignment of new sewers. <br /> • Estimate capital cost for construction of new sewers <br /> Subtask 3.2 Evaluate Existing Facilities <br /> • Confirm capacity of existing trunk sewers south of and up to Sunol Boulevard. <br /> • Confirm capacity of Pump Stations 5-12 and 5-14 and associated force mains. <br /> • Verify existing collection system infrastructure and conformance with City <br /> wastewater system standards. <br /> • Estimate capital costs for correcting deficiencies identified in the trunk sewers and <br /> pump stations. <br /> Assumptions: <br /> • Capacity evaluations and pipeline sizing will be based on up to three land use <br /> scenarios: <br /> • Existing land use with existing backbone sewer to golf course <br /> • County land use zoning at build-out <br /> • City General Plan land use development. <br /> • Fee estimate assumes that the difference between the three land use scenarios will <br /> be pipeline sizing; no changes in alignment or construction techniques is <br /> anticipated. <br /> • Sewer system will be evaluated using a static hydraulic model based on the <br /> InfoWorks ICM modeling engine.Although the model engine is capable of dynamic <br /> modeling,only static peak flows will be modeled. <br /> • Pipe invert information for existing sewers south of and at Sunol Blvd.will be based <br /> on City GIS data.Slope for new sewers will be based on minimum slopes for <br /> scouring velocities or 5 feet of cover. <br /> • Ground elevations will be based on the City's 5 foot ground contour data. <br /> • Base wastewater generation rates will use City standard criteria and assumptions or <br /> typical assumptions and criteria used by nearby agencies. <br /> • Dry weather and wet weather peaking factors will use either City standard criteria, <br /> criteria used in the City's previous master plan,or typical factors used by nearby <br /> agencies. <br /> • No new lift stations will be required. <br /> • Open cut construction will be suitable for all new pipelines. <br /> • Costs will be estimated for trunk facilities only;construction and connection of <br /> lower laterals will not be included. <br /> 2 <br />