Task 4—Happy Valley Water Distribution System Evaluation <br /> RMC will evaluate the capital needs associated with extending the City of Pleasanton water <br /> distribution system infrastructure to the land use parcels within the Happy Valley study <br /> area. <br /> Subtask 4.1 Evaluate New Facilities <br /> • Determine sizing and alignment of new water mains. <br /> • Estimate capital cost for construction of new water mains with appurtenances. <br /> Assumptions: <br /> • All existing facilities are assumed to be adequately sized for ultimate development. <br /> • Pipeline sizing will be based on the three demand scenarios identified in Task 3. <br /> • Water main sizing will be based on velocity and head loss criteria,and City minimum <br /> pipe sizing standards. <br /> • Modeling will not be performed. Flowrates will be assumed based on likely and <br /> appropriate flow paths. <br /> • Reservoir elevations are assumed to be adequate to meet minimum required <br /> distribution system pressures in the Happy Valley area. <br /> • Average annual water demand rates will use City standard criteria or typical <br /> assumptions used by nearby agencies. <br /> • Peaking factors will use either City standard criteria,assumptions used in the City's <br /> previous master plan,or typical factors used by nearby agencies. <br /> • Costs will be estimated for trunk facilities only;construction and connection of <br /> water service lines will not be included. <br /> Task.5—Happy Valley Water and Sewer Evaluation Technical Memorandum <br /> Draft and Final Technical Memorandums will be developed to summarize the results of Task <br /> 3 and Task 4,and the overall capital cost for Happy Valley. <br /> Assumptions: <br /> • Overall capital cost will include only costs estimated in Task 3 and Task 4,and any <br /> other costs directly provided by the City.Allocation of costs will not be considered in <br /> this study. <br /> 3 <br /> I <br />