My WebLink
|
Help
|
About
|
Sign Out
12b
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
021616
>
12b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 3:57:46 PM
Creation date
2/10/2016 3:57:43 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/16/2016
DESTRUCT DATE
15Y
DOCUMENT NO
12b
Document Relationships
12a
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2016\021616
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Scope of Services <br /> 1. PROJECT DESCRIPTION <br /> The scope of work to be provided by RMC includes professional services for the following: <br /> Evaluate the water and sewer facilities required to connect all parcels in the Happy Valley <br /> Study area to the City of Pleasanton's water distribution system and sewer collection system. <br /> Identify improvements required to the existing water and sewer facilities. Estimate capital <br /> cost for water and sewer facilities required for new facilities and improvements to existing <br /> facilities. <br /> 2. SERVICES INCLUDED <br /> The professional services provided by RMC for the above-described project shall include the <br /> following tasks: <br /> Task 1—Project Management <br /> Provide monthly progress reports,budget tracking,client meetings,and communications,and <br /> schedule coordination. <br /> Assumptions <br /> • One meeting is assumed to discuss results of draft report and all comments. <br /> • Project duration is assumed to be 4 months from receipt of Notice to Proceed from <br /> City. <br /> Task 2—Data Collection and Review <br /> RMC will prepare an initial request list of additional data and information that may be <br /> relevant.This list is included as Exhibit C. Data will be reviewed,and additional data will be <br /> requested as necessary. <br /> Assumptions <br /> • City will provide available applicable information via email or download from its GIS <br /> database. <br /> • RMC can rely on City provided information in analyzing the infrastructure needs for <br /> the study. <br /> Task 3—Happy Valley Sewer Collection System Evaluation <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.