My WebLink
|
Help
|
About
|
Sign Out
RES 16819
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:03:05 AM
Creation date
2/3/2016 1:27:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16819
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> Mitigation Measure 4.7-4:The City shall require the The project Community Review the project Prior to project Verified by: <br /> project applicant to reduce the project's estimated 5.6 applicant shall hire Development acoustical report and approval/prior to <br /> dBA increase on Lund Ranch Road to 4 dBA or less. an acoustical Department; amended plans(as issuance of <br /> Such a reduction could be achieved by: (a) reducing consultant to Planning Division necessary)to verify building or grading <br /> the number of residential units using Lund Ranch Road determine whether that 4 dBA noise permits. <br /> in order to sufficiently reduce noise generated by roadway repaving is increase threshold Date: <br /> project related traffic volumes;and/or(b)by requiring required to achieve would be achieved. <br /> resurfacing Lund Ranch Road (Independence Drive to the noise reduction <br /> project site boundary) and Independence Drive (from identified in the <br /> Lund Ranch Road to Hopkins Way) with noise measure. If such <br /> attenuating asphalt. If an updated noise analysis, repaving is <br /> prepared to the satisfaction of the Director of required,it shall be <br /> Community Development based on the Project's incorporated into <br /> circulation system approved by the City, demonstrates the project plans. <br /> that the noise increases to Lund Ranch Road, <br /> Independence Drive,and all neighborhood streets would <br /> be less than 4 dBA, the street resurfacing requirement <br /> would no longer apply. <br /> 4.8 Air Quality <br /> Mitigation Measure 4.8-1:To limit the project's Project applicant Community Approve air quality Prior to issuance Verified by: <br /> construction-related dust and criteria pollutant emissions, shall hire an air Development consultant selection. of grading or <br /> the following BAAQMD-recommended Basic quality consultant Department; Review verification building permit, <br /> Construction Mitigation Measures shall be included in the approved by the City Planning Division from air quality whichever is <br /> contractor specifications for the proposed project: of Pleasanton who consultant.Verify sooner;inspect <br /> a.All exposed surfaces(e.g., parking areas,staging will prepare a inclusion of dust during Date: <br /> areas,soil piles,graded areas,and unpaved access Construction Air control measures in construction. <br /> roads)shall be watered two times per day. Pollutant Control applicable <br /> b.All haul trucks transporting soil, sand,or other loose Plan that adheres to construction plans <br /> material off-site shall be covered. all specifications in and specifications; <br /> c.All visible mud or dirt track-out onto adjacent public this measure and conduct field <br /> roads shall be removed using wet power vacuum will verify In writing inspections during <br /> street sweepers at least once per day.The use of dry that the plan construction. <br /> power sweeping is prohibited. adheres to all of <br /> d.All vehicle speeds on unpaved roads shall be limited to BAAQMD's air <br /> 15 mph. quality guidance <br /> which is applicable <br /> e.All roadways, driveways,and sidewalks to be paved to the project. <br /> shall be completed as soon as possible. Building pads <br /> shall be laid as soon as possible after grading unless <br /> seeding or soil binders are used. <br /> f. Idling times shall be minimized either by shutting <br /> equipment off when not in use or reducing the <br /> maximum idling time to 5 minutes(as required by the <br /> California airborne toxics control measure Title 13, <br /> LUND RANCH II-PUD-25 15 JANUARY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.