My WebLink
|
Help
|
About
|
Sign Out
RES 16819
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:03:05 AM
Creation date
2/3/2016 1:27:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16819
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> Section 2485 of California Code of Regulations[CCR)). <br /> Clear signage shall be provided for construction <br /> workers at all access points. <br /> g.All construction equipment shall be maintained and <br /> properly tuned in accordance with manufacturer's <br /> specifications.All equipment shall be checked by a <br /> certified mechanic and determined to be running in <br /> proper condition prior to operation. <br /> h.A publicly visible sign with the telephone number and <br /> person to contact at the Lead Agency regarding dust <br /> complaints shall be posted at the site.This person <br /> shall respond and take corrective action within 48 <br /> hours.The Air District's phone number shall also be <br /> visible to ensure compliance with applicable <br /> regulations. <br /> Mitigation Measure 4.8-2(applies to all alternative The project applicant Community Verify inclusion of Prior to issuance Verified by: <br /> access scenarios):To reduce the project's shall include Development equipment of grading or <br /> construction-related NOx emissions,the following appropriate Department; specifications in building permit, <br /> provisions shall be included in the contractor construction Planning Division applicable whichever is <br /> specifications for the proposed project: equipment specifica- construction plans; sooner; inspect <br /> a.To reduce NOx during construction,all excavators, tions in construction conduct field during Date: <br /> dozers,scrapers,tractors, loaders,and backhoes used plans for project. inspections during construction. <br /> for project construction shall be equipped with Tier 3- construction. <br /> rated engines.Alternatively,the number of pieces of <br /> diesel-powered equipment operating simultaneously <br /> could be limited in order to achieve the same level of <br /> NOx reduction. <br /> b.All contractors shall use equipment that meets the <br /> CARB's most recent certification standard for off-road <br /> heavy-duty diesel engines for a given model year <br /> engine. <br /> 4.10 Cultural Resources <br /> Mitigation Measure 4.10-1:The following mitigation Project applicant Community Verify and approve Prior to issuance Verified by: <br /> measures shall be required to reduce potential cultural shall hire a qualified Development archaeologist; of grading permit; <br /> resources impacts to a less-than-significant level: archaeologist to Department; review and approve inspect during <br /> • A program of archaeological monitoring should train contractor Planning Division archaeological construction. <br /> be undertaken for all construction related workers, including mitigation program, <br /> earthmoving activities in the vicinity of the ranch supervisory if needed. Date: <br /> complex and within 100 feet of the drainage as personnel,to <br /> it exits the compound and flows west out of the monitor worker <br /> Lund Ranch project area.The duration of the activities. <br /> monitoring program should be determined by <br /> LuND RANCH II—PUD-25 16 JANUARY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.