Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> include the following: Inspect site during <br /> a. Implement best available noise control construction to <br /> techniques such as mufflers, intake silencers, ensure compliance <br /> ducts, engine enclosures,acoustically with project <br /> attenuating shields or shrouds. construction plans. <br /> b. Equipment used for project construction shall be <br /> hydraulically-or electrically-powered impact <br /> tools(e.g.,jackhammers,pavement breakers, <br /> and rock drills)wherever possible to avoid noise <br /> associated with compressed air exhaust from <br /> pneumatically-powered tools. However,where <br /> use of pneumatically powered tools is <br /> unavoidable,an exhaust muffler on the <br /> compressed air exhaust shall be used;this <br /> muffler should lower noise levels from the <br /> exhaust by up to about 10 dBA. External <br /> jackets on the tools themselves shall be used <br /> where feasible,and this should achieve a <br /> reduction of 5 dBA. Quieter procedures such as <br /> drilling rather than impact equipment shall be <br /> used whenever feasible. <br /> c. Stationary noise sources shall be located as far <br /> from residential receptors as possible. If they <br /> must be located near residential receptors,they <br /> should be adequately muffled and enclosed <br /> within temporary sheds. <br /> d. Limit continuous operation of heavy equipment <br /> near sensitive receptors. <br /> e. The name and phone number of the designated <br /> project liaison shall be posted at the project site <br /> boundary so that the public can contact the <br /> liaison if noise disturbance occurs.This liaison <br /> shall immediately take steps to resolve any <br /> complaints received,including modifying <br /> construction practices as necessary to address <br /> the noise complaint. <br /> Mitigation Measure 4.7-2: To minimize the number of The project Community Verify and approve Prior to issuance Verified by: <br /> residents exposed to temporary increases in truck traffic applicant shall Development Construction Traffic of building and <br /> noise,construction-related trucks shall be required to prepare a Department; Management Plan. grading permit(s). <br /> use Independence Drive to Bernal Avenue to access Construction Traffic Traffic Division <br /> Sunol Boulevard and the 1-680 freeway. In addition,haul Management Plan and Construction Verify that Field inspections <br /> and delivery truck operations shall be limited to the that incorporates Services construction traffic during Date: <br /> daytime weekday hours(7:00 a.m.to 7:00 p.m.)to the provisions of uses identified construction. <br /> minimize noise disturbance. this measure. routes. <br /> LUND RANCH II-PUD-25 14 JANUARY 2016 <br />