My WebLink
|
Help
|
About
|
Sign Out
RES 16819
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2016
>
RES 16819
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 11:03:05 AM
Creation date
2/3/2016 1:27:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
16819
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> Mitigation Measure 4.5-4: The project sponsor,working Project applicant Community Verify the Prior to issuance Verified by: <br /> with the Alameda Countywide Clean Water Program, shall prepare Development preparation of of grading permit. <br /> shall implement a program to educate buyers about the appropriate Department; stormwater <br /> potential water quality effects of stormwater pollution and stormwater Planning Division pollution/ <br /> effective measures to prevent the generation of pollution/hazardous and Engineering hazardous waste <br /> stormwater pollutants from residential land uses.At a waste informational Division educational Date: <br /> minimum,the program shall address stormwater materials for program and <br /> pollutants such as hazardous materials commonly used distribution to and associated <br /> in household applications; spilled oil,fuel,and other use by project materials;verify <br /> fluids such as antifreeze from vehicles;construction residents. inclusion of <br /> debris; landscape chemicals such as pesticides, materials as part of <br /> herbicides,and copper-based algaecides; used packing buyer purchase <br /> materials; paint products;trash and litter;excess agreement. <br /> irrigation;and car washing. Educational materials <br /> developed under this program shall identify alternative <br /> products that are more environmentally friendly as well <br /> as methods to control stormwater pollutants at their <br /> source.The materials shall also be consistent with <br /> materials available from the Alameda Countywide Clean <br /> Water Program and shall be provided to the buyer at the <br /> time of purchase. <br /> 4.6 Traffic and Circulation <br /> Mitigation Measure 4.6-2(applies to all alternative Project applicant Community Calculate the fees Prior to issuance Verified by: <br /> access scenarios):The project's impact on study shall contribute fair- Development and confirm receipt of building <br /> intersections would be mitigated by the payment of traffic share funds for Department; of payment. permits. <br /> impact fees,which is proposed by the project applicant. traffic impact fees. Traffic Division <br /> The need to signalize the Sunol Boulevard/I-680 <br /> Northbound Ramp and Sunol Boulevard/I-680 Date: <br /> Southbound Ramp intersections have been identified in <br /> the City's General Plan as future planned improvements <br /> to which the project would contribute through the <br /> payment of traffic impact fees.With signalization,these <br /> intersections would operate at acceptable service levels, <br /> reducing this impact to a less-than-significant level. <br /> 4.7 Noise <br /> Mitigation Measure 4.7-1: Project contractors will be The project Community Review project Prior to issuance Verified by: <br /> required to comply with Pleasanton Municipal Code applicant shall Development specifications and of building and <br /> (Section 9.04.100),which would restrict noise generation incorporate the Department; grading and grading permit(s). <br /> by construction to the hours of 8:00 a.m.and 8:00 p.m. specifications of Construction construction plans <br /> on Mondays through Saturdays. All construction this measure into Services for inclusion of Field inspections <br /> equipment shall generate noise levels no greater than 83 the project specifications in this during Date: <br /> dBA(Leq)at 25 feet. Feasible noise controls that could construction plan. measure. construction. <br /> be implemented to reduce equipment noise levels <br /> LUND RANCH II-PUD-25 13 JANUARY 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.