My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
010516
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 3:26:28 PM
Creation date
12/29/2015 3:26:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
15Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
leaders into landscaping areas, and providing containers that can hold recycled <br /> water for irrigation purposes in lieu of using potable water. <br /> Final Environmental Impact Report(EIR) Mitigations <br /> 44. All mitigation measures identified in the Mitigation Monitoring and Reporting <br /> Program (MMRP) prepared for the Lund Ranch II Final EIR subject project shall <br /> be implemented, as summarized below. All traffic fees to which the property may <br /> be subject, as set forth in the MMRP, shall be paid prior to issuance of a building <br /> permit. If any of the conditions of approval conflict with any applicable EIR <br /> mitigation measures, the requirements of EIR mitigation measures, summarized <br /> below, apply. <br /> Biological Resources <br /> a Mitigation Measures 4.3-la and 4.3-1b: preparation of Oak Woodland <br /> Restoration and Management Plan, and implementation of the City's Tree <br /> Ordinance. <br /> • Mitigation Measures 4.3-2a and 4.3-2b: preservation and management of <br /> California Tiger Salamander habitat, and implementation of species <br /> protection measures during project construction. <br /> • Mitigation Measure 4.3-3: implementation of bat protection measures. <br /> • Mitigation Measure 4.3-4: implementation of protection measures for <br /> raptors, burrowing owls, and migratory birds. <br /> • Mitigation Measure 4.3-5: mitigation of loss of Waters of the United States. <br /> Geology and Soils <br /> • Mitigation Measure 4.4a and Mitigation Measure 4.4b: implementation of <br /> landslide repair and protection measures. <br /> • Mitigation Measures 4.4-2a through 4.4-2c: implementation of erosion <br /> control techniques. <br /> • Mitigation Measures 4.4-3a through 4.4-3f: implementation of measures <br /> related to debris catchment, grading, cut slopes, and subsurface drainage, <br /> and slope stabilization. <br /> • Mitigation Measure 4.4-5: removal of non-engineered fill and similar <br /> materials. <br /> • Mitigation Measures 4.4-6a through 4.4-6d: implementation of measures <br /> related to engineered fill. <br /> Hydrology and Water Quality <br /> • Mitigation Measure 4.5-3: implementation of erosion control techniques. <br /> • Mitigation Measure 4.5-4: institution of an educational program related to <br /> stormwater management and protection. <br /> Traffic and Circulation <br /> a Mitigation Measure 4.6-2: payment of traffic impact fees. <br /> Page 9 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.