My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
010516
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 3:26:28 PM
Creation date
12/29/2015 3:26:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
15Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Noise <br /> o Mitigation Measure 4.7-1: reduction of noise during the construction period <br /> and compliance with Section 9.04.100 of the Pleasanton Municipal Code. <br /> e Mitigation Measure 4.7-2: restrictions on travel routes for construction <br /> trucks. <br /> e Mitigation Measure 4.7-4: reduction of traffic-related noise on Lund Ranch <br /> Road. <br /> Air Quality <br /> e Mitigation Measure 4.8-1: reduction of air pollutants during the <br /> construction period. <br /> e Mitigation Measure 4.8-2: reduction of nitrogen oxides (NOx) during the <br /> construction period (applies to all alternative access scenarios). <br /> Cultural Resources <br /> • Mitigation Measure 4.10-1: requirements for monitoring and protecting <br /> archaeological resources. <br /> • Mitigation Measure 4.10-2: documentation of the ranch complex on the <br /> site. <br /> Hazards and Hazardous Materials <br /> e Mitigation Measure 4.12-1: implementation of a Buyer Education Program <br /> for Household Hazardous Waste. <br /> e Mitigation Measure 4.12-2: establishment of protocols for the identification <br /> of previously unidentified hazardous materials during the construction <br /> period. <br /> e Mitigation Measure 4.12-3: completion of a Hazardous Materials Building <br /> Survey and recommended abatement measures. <br /> e Mitigation Measures 4.12-4a and 4.12-4b: reduction of fire hazards and <br /> compliance with a Wildland Urban Interface Plan and Fire Prevention <br /> Plan. <br /> e Mitigation Measures 4.12-5a through 4.12-5c: implementation of fire <br /> hazard reduction measures, including a Fire Safety Awareness Program <br /> and design provisions in the Wildland Urban Interface Plan. <br /> Energy Conservation <br /> e Mitigation Measure 4.8-1: reduction of air pollutants during the <br /> construction period. <br /> e Mitigation Measure 4.14-2: incorporation of building features to support <br /> alternative energy systems. <br /> Building and Safety Division <br /> 45. The project applicant or developer shall submit plot plans for each of the <br /> residential lots showing building setbacks and a topographic plan showing <br /> grading and drainage. Pad elevations, finish floor elevations, retaining walls, <br /> Page 10 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.