My WebLink
|
Help
|
About
|
Sign Out
01
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
010516
>
01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 3:26:28 PM
Creation date
12/29/2015 3:26:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
1/5/2016
DESTRUCT DATE
15Y
DOCUMENT NO
01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34. The haul route for all materials to and from this development shall be approved <br /> by the City Engineer prior to the issuance of a permit. <br /> 35. The project applicant or developer and/or the project applicant's or developer's <br /> contractor(s) shall obtain an encroachment permit from the City Engineer prior to <br /> moving any construction equipment onto the site. <br /> 36. A - • - - - - - - - - - - ... - - - - - - •- -- - -- e . . : - - <br /> ■ - <br /> Community Development and subject to staff Icvcl design review prior to the <br /> Landscaping Requirements <br /> 37. The project applicant or developer shall enter into an agreement with the City, <br /> approved by the City Attorney, which guarantees that all landscaping and open <br /> space areas included in this project will be maintained at all times in a manner <br /> consistent with the approved landscape plan for this development. Said <br /> agreement shall run with the land for the duration of the existence of the <br /> structures located on the subject property. <br /> Climate Action Plan <br /> 38. In accordance with Climate Action Plan (CAP) Measure LU3-2, the project shall <br /> provide building, landscape, and streetscape development features that <br /> encourage bicycle and pedestrian access, to the satisfaction of the Director of <br /> Community Development. <br /> 39. In accordance with CAP Measure LU3-5, all streets within the project site shall <br /> be designed to Complete Streets standards except for the connection to Sunset <br /> Creek Lane. <br /> 40. In accordance with CAP Measure NM1-13, the applicant shall install the trail <br /> system within the project site that is identified in the Pedestrian and Bicycle <br /> Master Plan. <br /> 41. In accordance with CAP Measure EC1-3, light-colored paving materials shall be <br /> used on all streets within the project site. <br /> 42. In accordance with CAP Measure EC4-4, the plans for residential units shall <br /> incorporate solar tubes, skylights, and/or other daylighting systems within the <br /> building design. These systems shall be identified on plans submitted to the <br /> Building and Safety Division for permits. <br /> 43. In accordance with CAP Measure WA-3-4, the project shall incorporate rain <br /> harvesting. Acceptable methods to achieve this measure include directing roof <br /> Page 8 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.