TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Mitigation Measures Implementation Monitoring Monitoring and Monitoring Verification of <br /> Procedures Responsibility Reporting Action Schedule Compliance <br /> vehicles now abandoned there. <br /> Some materials and/or items, such as the horse drawn <br /> wagon, may be of interest to local historical societies or <br /> groups. An attempt should be made to consult with <br /> organizations who may have an interest in materials for <br /> re-use before they are cleared from the construction site. <br /> 4.12 Hazards and Hazardous Materials <br /> Mitigation Measure 4.12-1:The project sponsor, Project applicant Community Verify the Prior to issuance Verified by: <br /> working with the City of Pleasanton and Alameda County shall prepare Development preparation of occupancy <br /> Household Hazardous Waste Program, shall implement appropriate Department; hazardous waste permits. <br /> a Buyer Education Program for Household Hazardous hazardous waste Engineering educational <br /> Waste, developing materials to educate buyers about the informational Division program and <br /> identification of household hazardous wastes, materials for associated Date: <br /> appropriate disposal methods, and available drop off distribution to and materials; verify <br /> facilities At a minimum, the materials shall provide a list use by project inclusion of <br /> of example household hazardous wastes, discuss the residents. materials as part of <br /> environmental impacts of improper disposal, and provide buyer purchase <br /> a list of available drop off facilities. The educational agreement. <br /> materials shall be provided to the buyer at the time of <br /> purchase <br /> Mitigation Measure 4.12-2: Contingency Plan. The The project sponsor Community Verify that the Prior to issuance Verified by: <br /> project sponsor shall require the construction shall prepare a Development Contingency Plan is of grading or <br /> contractor(s)to observe for previously unidentified Contingency Plan Department; adequate. building permit, <br /> hazardous materials and have a contingency plan for that establishes Engineering whichever is <br /> sampling and analysis of potential hazardous materials in protocols for the Division sooner. <br /> soil. If any hazardous materials are identified, the identification of Date: <br /> contractor(s) shall be required to prepare a Health and previously <br /> Safety Plan, conduct sampling to assess the chemicals unidentified <br /> present, and identify appropriate disposal methods hazardous <br /> Evidence of potential contamination includes soil materials. <br /> discoloration, suspicious odors,the presence of USTs,or <br /> the presence of buried building materials.The project <br /> sponsor shall also be required to notify the regulatory <br /> agencies if the concentration of any chemical exceeds its <br /> respective screening level.The assigned lead agency <br /> shall oversee all aspects of the site investigation and <br /> remedial action and determine the adequacy of the site <br /> investigation and remediation activities at the site. <br /> Mitigation Measure 4.12-3: Prior to demolition of the on- Project applicant Community Verify the Prior to issuance Verified by: <br /> site buildings,the project sponsor shall ensure that a shall hire a Development completion of of demolition <br /> Hazardous Building Materials Survey is completed by a Registered Department, required surveys; permit; inspect <br /> Registered Environmental Assessor or a registered Environmental Engineering conduct field during <br /> LUND RANCH I I—PUD-25 18 JANUARY 2016 <br />