Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> • Implementation. Monitoring Monitoring and Monitoring Verificatiorr,of <br /> Mitigation Measures Procedures' Responsibility Reporting Action Schedule Compliance <br /> Mitigation Measure 4.3-5: The proposed project would Project applicant Community Review and Prior to issuance Verified by: <br /> impact approximately 0.022 acre of Waters of the United shall hire a qualified Development approve a of grading or <br /> States(0.016 acre and 243 lineal feet of drainage wetlands biologist Department; qualified wetlands building permit, <br /> channel waters, and 0.006 acre of in-channel wetlands). approved by the City Planning Division biologist and whichever is <br /> The connection to Sunset Creek Lane would require of Pleasanton who wetland restoration sooner. <br /> approximately 100 linear feet(400 square feet)of will prepare a plan plan Date: <br /> additional impact. While compensation for impacts to for creation of Review monitoring <br /> Waters of the United States shall occur at a minimum of appropriate Verify inclusion of reports for <br /> a 1:1 replacement ratio, the CDFW and RWQCB replacement all permit-required wetland <br /> generally require a replacement ratio of 2.1 or better. To wetlands that measures in restoration sites <br /> the degree possible,the applicant shall replace lost adheres to all applicable for a minimum of <br /> wetland resources in kind. Thus, the project would specifications in this construction plans five years and <br /> create at least 343 feet of channel (1:1 ratio)and 0.031 measure and will and specifications. verify that <br /> acres of waters of the US (seasonal drainage channel), verify in writing that Inspect site during required <br /> of which would be at least 0.006 acres of seasonal the plan adheres to construction to monitoring reports <br /> wetlands on the Lund Ranch property. Creation of new all guidance that is ensure compliance have been <br /> channels can be logistically difficult as there are finite applicable to the with project submitted to <br /> areas within a site to accomplish this type of mitigation. project, including construction plans. Responsible <br /> Therefore, some mitigation for the seasonal channel conditions imposed Agencies. <br /> may have to be out-of-kind.This could be accomplished as part of all <br /> by creating additional seasonal wetlands. The creation Responsible Agency <br /> of not less than 0.031 acre of wetland and/or seasonal permits needed for <br /> channel would be required. this work. <br /> The site supports sufficient opportunities to <br /> accommodate creation of wetland habitat. Even if the <br /> project could not create 343 feet of channel,there are a <br /> number of areas along Drainage Areas A and B and <br /> within the non-jurisdictional drainage swales on the site <br /> that could easily accommodate this type of creation <br /> mitigation. <br /> The goal of this mitigation should be to create new <br /> wetlands and enhance existing wetlands in a way that <br /> replaces the functions and values of the wetlands that <br /> are proposed to be filled. A qualified biologist should <br /> develop a restoration plan that identifies the full extent of <br /> the impact, location of suitable sites to create or <br /> enhance wetlands of the necessary acreage,and <br /> develop success criteria specific to the actual wetland • <br /> creation design. The mitigation site should be monitored <br /> for at least five years.A detailed wetland restoration plan <br /> should be developed for this mitigation area during the <br /> regulatory permitting phase of the project.The plan will <br /> be subject to the review and approval of the USAGE, <br /> RWQCB, CDFG and the City of Pleasanton. This plan <br /> should incorporate additional studies and details, 6 <br /> fo-115 JUNE 2015 <br /> ® Type and acreage of wetland to be impacted and <br /> goals for wetland creation <br /> - n....,:u 4 ......_. _s„_:i ....a..L:i:...t..-.....,u....4 <br />