My WebLink
|
Help
|
About
|
Sign Out
RES 15811
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 2:44:12 PM
Creation date
12/29/2015 2:44:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 15811
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> i Implementation Monitoring Monitoring and ' Monitoring Verification of <br /> Mitigation Measures Procedures • . Responsibility Reporting Action Schedule . ' Compliance <br /> Mitigation Measure 4.3-4: The implementation of the The project Community Review and Prior to issuance Verified by: <br /> following measures would ensure that raptors(hawks applicant shall hire a Development approve of grading or <br /> and owls)and other migratory birds are not disturbed qualified Department; qualified building permit, <br /> during the breeding season and that burrowing owls and ornithologist and the Planning Division ornithologist. whichever is <br /> occupied habitat are not taken at any time of year: project applicant's sooner. <br /> a. A qualified ornithologist shall conduct a pre- contractor(s)shall Review pre- Date: <br /> construction survey for nesting raptors(including engage the qualified construction Field inspections <br /> both tree and ground nesting raptors) and other ornithologist to survey reports. prior to and during <br /> migratory birds on-site within two weeks of the onset conduct pre- If active nests or construction. No <br /> of site disturbance(e.g. demolition,vegetation construction surveys suitable burrowing more than 14 <br /> removal and earthwork), if ground disturbance is to as described. owl habitat are days before start <br /> occur during the breeding season(February 1 to found, review and or restart of <br /> August 31). These surveys shall be based on the The project approve the construction <br /> accepted protocols for the target species.These applicant shall construction plan during the months <br /> surveys shall explicitly consider the burrowing owl as prepare construction that includes of February to <br /> a potential target species and pre-construction efforts plans avoidance of owl, August. <br /> shall be conducted according to the most recent that incorporate the nesting raptors, Confirm buffer <br /> protocol. If a nesting raptor or active nest of another recommendations of and other migratory zones if active <br /> migratory bird were to be detected, an appropriate no the pre- birds. burrows are <br /> disturbance buffer would be established in construction Inspect found. <br /> consultation with CDFW. In general, no-disturbance surveys. If required, construction site to <br /> buffers around active nests of raptors are 250-300 avoidance confirm <br /> feet,while the buffers around the nests of passerines procedures will be implementation of <br /> (perching) are 50 feet. The actual size of buffer would implemented. protection <br /> depend on species,topography,and type of measures. <br /> construction activity that would occur in the vicinity of <br /> the nest.The location of no-disturbance buffers <br /> would be marked in the field and communicated to <br /> the construction team during the preconstruction <br /> environmental training meeting described above in <br /> Mitigation Measure 4.3-2b. <br /> b.A qualified ornithologist shall conduct pre- <br /> construction surveys for burrowing owls during the <br /> non-breeding season. Pre-construction surveys <br /> during the non-breeding season are not necessary <br /> for tree nesting raptors, as they are expected to <br /> abandon their roosts during construction. If pre- <br /> construction surveys (conducted either during the <br /> breeding or non-breeding season)determine that <br /> burrowing owls occupy the site, mitigation consistent <br /> with the Staff Report on Burrowing Owl Mitigation <br /> (CDFG, 2012)would be implemented. Mitigation <br /> measures may include take avoidance, site <br /> surveillance, minimizing impacts through the use of <br /> no disturbance buffers, burrow exclusion and closure 5 <br /> 1_,A/I JCNMhh Pr ith one-way doors)and JUNE 2015 <br /> compensation`fo`r e loss of occupied habitat. These <br /> measures may be necessary to ensure that owls are <br /> not harmed or iniured during construction.and that <br />