Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> • <br /> Implementation ' • Monitoring Monitoring and Monitoring Verification of <br /> Mitigation:Measures ,Procedures Responsibility Reporting Action Schedule Compliance <br /> 4.4 Geology and Soils <br /> Mitigation Measure 4.4-1a: In general, landslide debris Project applicant Community Review and Prior to issuance Verified by: <br /> shall be removed where present and replaced with shall prepare Development approve corrective of grading permit. <br /> engineered fill in accordance with the approved corrective grading Department; grading plan; <br /> corrective grading plan. More detailed information plan in conjunction Engineering ensure that all Field inspections <br /> regarding the location, extent, and depth of the required with project final Division recommendations during <br /> landslide mitigation shall be depicted on the final project grading plan. of the project construction. Date: <br /> corrective grading plan to be submitted with the final geotechnical report <br /> grading plan, subject to review and approval by the City are properly <br /> of Pleasanton Building and Safety Services Division implemented. <br /> Mitigation Measure 4.4-1b: Landslide repairs shall be <br /> conducted on the natural slope behind Lots 24 and 25 <br /> (Landslide 17)and the proposed cut and fill slope <br /> adjacent to the driveway south of Lots 24 and 25 shall <br /> also be regarded. The finished slopes should be graded <br /> to approximately re-create the existing slope contours <br /> and to conform as much as possible with the adjacent <br /> natural slopes. <br /> Mitigation Measure 4.4-2a: In the event of a work The project Community Review and Prior to issuance Verified by: <br /> stoppage due to rain during construction,the contractor applicant shall Development approve of grading permit. <br /> shall construct positive slopes to carry water surface incorporate the Department; drainage/erosion <br /> runoff away from steep slopes to storm drainage specifications of this Engineering control plan(s); Field inspections <br /> structures or other areas where erosion can be measure into project Division ensure that all during <br /> controlled. In no event shall a completed slope be left plans. recommendations construction. Date: <br /> standing through the winter season without erosion of the project <br /> control features being provided. geotechnical report <br /> Mitigation Measure 4.4-2b: The onsite geotechnical are properly <br /> engineer shall determine the depth of topsoil in the field implemented. <br /> during grading. Identified top soil shall be reserved and <br /> placed on graded slopes. Excess top soil that is not <br /> suitable for use as engineered fill may be used in <br /> approved open space of landscape areas, if approved by <br /> the landscape architect. <br /> Mitigation Measure 4.4-2c:All landscaped slopes shall <br /> be maintained in a vegetated state after project <br /> completion using drought-tolerant vegetation requiring <br /> infrequent drip irrigation. No pressurized irrigations shall <br /> be placed at or near the tops of graded slopes. <br /> 7 <br /> LUND RANCH I I-PUD-25 JUNE 2015 <br />