Laserfiche WebLink
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Implementation Monitoring Monitoring and - Monitoring Verification.of <br /> Mitigation Measures Procedures • .Responsibility Reporting Action Schedule Compliance <br /> Mitigation Measure 4.8-2(applies to all alternative The project Community Verify inclusion of Prior to issuance Verified by: <br /> access scenarios):To reduce the project's applicant shall Development equipment of grading or <br /> construction-related NOx emissions, the following include appropriate Department; specifications in building permit, <br /> provisions shall be included in the contractor construction Planning Division applicable whichever is <br /> specifications for the proposed project: equipment specifica- construction plans; sooner; inspect <br /> a.To reduce NOx during construction, all excavators, tions in construction conduct field during Date: <br /> dozers, scrapers,tractors, loaders, and backhoes plans for project. inspections during construction. <br /> used for project construction shall be equipped with construction. <br /> Tier 3-rated engines.Alternatively,the number of <br /> pieces of diesel-powered equipment operating <br /> simultaneously could be limited in order to achieve the <br /> same level of NOx reduction. <br /> b.All contractors shall use equipment that meets the <br /> CARB's most recent certification standard for off-road <br /> heavy-duty diesel engines for a given model year <br /> engine <br /> 4.10 Cultural Resources <br /> 14 <br /> LUND RANCH I I-P(JD-25 JUNE 2015 <br />