My WebLink
|
Help
|
About
|
Sign Out
RES 15811
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 2:44:12 PM
Creation date
12/29/2015 2:44:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 15811
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> • Implementation Monitoring Monitoring,and Monitoring Verification of <br /> Mitigation Measures Procedures. Responsibility Reporting Action. Schedule Compliance <br /> Mitigation Measure 4.8-1: To limit the project's Project applicant Community Approve air quality Prior to issuance Verified by: <br /> construction-related dust and criteria pollutant shall hire an air Development consultant of grading or <br /> emissions,the following BAAQMD-recommended Basic quality consultant Department; selection. Review building permit, <br /> Construction Mitigation Measures shall be included in approved by the City Planning Division verification from air whichever is <br /> the contractor specifications for the proposed project: of Pleasanton who quality consultant. sooner; inspect <br /> a.All exposed surfaces (e.g., parking areas, staging will prepare a Verify inclusion of during Date: <br /> areas, soil piles, graded areas,and unpaved access Construction Air dust control construction. <br /> roads) shall be watered two times per day. Pollutant Control measures in <br /> b.All haul trucks transporting sod, sand,or other loose Plan that adheres to applicable <br /> material off-site shall be covered. all specifications in construction plans <br /> this measure and and specifications; <br /> c.All visible mud or dirt track-out onto adjacent public will verify In writing conduct field <br /> roads shall be removed using wet power vacuum that the plan inspections during <br /> street sweepers at least once per day.The use of dry adheres to all of construction. <br /> power sweeping is prohibited. BAAQMD's air <br /> d.All vehicle speeds on unpaved roads shall be limited quality guidance <br /> to 15 mph. which is applicable <br /> e.All roadways, driveways, and sidewalks to be paved to the project. <br /> shall be completed as soon as possible. Building pads <br /> shall be laid as soon as possible after grading unless <br /> seeding or soil binders are used. <br /> f. Idling times shall be minimized either by shutting <br /> equipment off when not in use or reducing the <br /> maximum idling time to 5 minutes(as required by the <br /> California airborne toxics control measure Title 13, <br /> Section 2485 of California Code of Regulations <br /> [CCR]). Clear signage shall be provided for <br /> construction workers at all access points. <br /> g.All construction equipment shall be maintained and <br /> properly tuned in accordance with manufacturer's <br /> specifications.All equipment shall be checked by a <br /> certified mechanic and determined to be running in <br /> proper condition prior to operation. <br /> h.A publicly visible sign with the telephone number and <br /> person to contact at the Lead Agency regarding dust <br /> complaints shall be posted at the site.This person <br /> shall respond and take corrective action within 48 <br /> hours.The Air District's phone number shall also be <br /> visible to ensure compliance with applicable <br /> regulations. <br /> 13 <br /> LUND RANCII I I-PUD-25 JUNE 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.