My WebLink
|
Help
|
About
|
Sign Out
RES 15811
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2015
>
RES 15811
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2015 2:44:12 PM
Creation date
12/29/2015 2:44:07 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/2015
DESTRUCT DATE
PERMANENT
DOCUMENT NO
RES 15811
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 1. MITIGATION MONITORING AND REPORTING PROGRAM <br /> Implementation Monitoring Monitoring and • Monitoring ' Verification of <br /> Mitigation Measures • Procedures Responsibility Reporting Action Schedule •Compliance <br /> Mitigation Measure 4.10-1:The following mitigation Project applicant Community Verify and approve Prior to issuance Verified by: <br /> measures shall be required to reduce potential cultural shall hire a qualified Development archaeologist; of grading <br /> resources impacts to a less-than-significant level: archaeologist to Department; review and approve permit; inspect <br /> • A program of archaeological monitoring should train contractor Planning Division archaeological during <br /> be undertaken for all construction related workers, including mitigation program, construction. <br /> earthmoving activities in the vicinity of the ranch supervisory if needed. Date: <br /> complex and within 100 feet of the drainage as personnel,to <br /> it exits the compound and flows west out of the monitor worker <br /> Lund Ranch project area.The duration of the activities. <br /> monitoring program should be determined by <br /> the project archaeologist in conjunction with the In the event that <br /> project sponsor and the Pleasanton Planning archaeological <br /> Department. In the event of any discovery,work resources are <br /> should be stopped within 50 feet of any discovered, project <br /> discovery until a proposal for the evaluation of applicant shall <br /> the resource as required by CEQA guidelines retain a qualified <br /> has been submitted to the lead agency for archaeologist to <br /> approval. If evaluation of the resource through a evaluate the <br /> program of hand excavation demonstrates that resource(s)and <br /> the resource is eligible for inclusion on the prepare an <br /> California Register of Historic Resources, a archaeological <br /> proposal for mitigation of impacts to the mitigation program <br /> resource should be submitted to the lead as described. <br /> agency for approval before work is allowed to <br /> recommence in the area of recorded <br /> archaeological deposit. <br /> • In the event that historic archaeological <br /> deposits are uncovered during site monitoring, <br /> work should be halted within 20 feet of any <br /> discovery until the deposit has been evaluated <br /> for potential significance through a program of <br /> hand excavation if necessary. If it is determined <br /> that the deposit qualifies for inclusion on the <br /> California Register, a plan for mitigation of <br /> impacts to the resource should be submitted to <br /> the lead agency for approval before any actual <br /> mitigation efforts are undertaken prior to the <br /> continuation of grading operations. Mitigation <br /> can include the recording in situ and/or removal <br /> of additional historical materials by an <br /> archaeological team for later analysis combined <br /> with continued monitoring of earthmoving <br /> activities in the vicinity of any discovery. <br /> 15 <br /> LUND RANCH I I-PUD-25 JUNE 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.