Laserfiche WebLink
Pedestrian and Bicycle Master Plan Update for the City of Pleasanton <br /> - <br /> Task 4.3 Assessment of Citywide Bicycle Level of and pedestrian planning and design. The project list <br /> Traffic Stress refresh will be assembled based on existing conditions <br /> For this task, Fehr & Peers will complete an LTS analysis, public input, feedback from City Staff and the <br /> analysis of Pleasanton's existing roadway network BPTC, and results of the Task 4 LTS analysis. To provide <br /> using our LTS+ tool, which examines number of travel accurate and comprehensive cost estimates, we will <br /> lanes, posted speed limit, and bikeway type. use Fehr & Peers' Active Transportation Plan <br /> Completing an LTS assessment for the full roadway Network Cost Estimating Tool, which was developed <br /> network will allow the City to prioritize low-stress specifically for Alameda County. This will allow us to <br /> bikeways throughout the City and understand where efficiently and accurately prepare network-level cost <br /> cyclists currently feel most comfortable. This estimates that will better position the City for grant <br /> assessment will allow the City to target roadways for application and countywide funding. <br /> bikeway improvements to appeal to the widest range Task 5.2 Project Prioritization <br /> of potential bicyclists. We understand that one of the key emphasis areas <br /> TASK 4 DELIVERABLES for the Plan Update is the provision of a prioritized <br /> • Draft and final mapping of existing bicycle network <br /> list of projects that the City can confidently move <br /> and priority pedestrian network forward with.We will work closely with the City, BPTC, <br /> and the community to understand community <br /> • Draft and final mapping of collisions analysis <br /> priorities and how projects are delivered in Pleasanton. <br /> memorandum, including bicycle-auto and This will allow us to target specific funding for projects <br /> pedestrian-auto mappings and more accurately prioritize projects. At Workshop <br /> • Draft and final mapping of citywide bicycle level of #2, we will vet the prioritization criteria used to sort <br /> traffic analysis and corresponding technical the network into first and second tier priority projects. <br /> memorandum We will kick-off this task by reviewing what worked <br /> Optional Task 4.4 Pedestrian Connectivity Analysis and did not work about the prioritization criteria from <br /> In the previous Plan update, we prepared a latent the 2010 Plan. We anticipate proximity to activity <br /> pedestrian demand analysis. This information is still centers (BART, schools, etc) and safety being the two <br /> useful in understanding potential for walking in driving factors in project selection. <br /> Pleasanton. However, this information can be TASK 5 DELIVERABLES <br /> substantially supplemented through an understanding Draft and final mapping and technical <br /> •of how connected the pedestrian environment is. pp g <br /> Under this optional task, we would complete memorandum of bicycle and pedestrian network, <br /> quantitative GIS-based analysis of how connected the including incorporation of comments received <br /> pedestrian network is in the priority pedestrian zones. through Workshop#1 and #2, and BPTC Meeting <br /> We would overlay this with the previous pedestrian #2-#3 <br /> latent demand analysis and collision analysis to • Draft and final project prioritization list and <br /> understand an overall "heat map" for walking in technical memorandum of bicycle and pedestrian <br /> Pleasanton, that show where areas have a high degree network, including incorporation of comments <br /> of potential demand but are less connected and/or received through Workshop#1 and#2, and BPTC <br /> have more safety issues. Meeting #2-#3 <br /> TASK 5.ACTIVE TRANSPORTAITON NETWOK TASK 6.PRIORITY PROJECT&IMPLEMENTATION PLAN <br /> DEVELOPMENT Once we have prioritized the network, we will work <br /> Under Task 5, Fehr & Peers will refresh the projects with the City to further define the top ten priority <br /> that will comprise the recommended Citywide bicycle projects and identify ways to phase and implement the <br /> and pedestrian networks, with an emphasis on low- Plan. Once we have worked with the City to develop a <br /> stress bicycle and pedestrian improvements. strategy for implementation of a prioritized list of <br /> Task 5.1 Bicycle&Pedestrian Network Refresh projects, we will craft an overall strategy for phasing <br /> Fehr& Peers will refresh the 2010 project list with new and delivery of projects. <br /> candidate bicycle and pedestrian projects that Task 6.1 Development of Priority Project Concepts <br /> maximize safety, comfort, and accessibility for all users. Once the priority projects are confirmed after <br /> We will review the previous project list to make sure Workshop #2, we will work with the City and BPTC to <br /> that the recommendations are still relevant based on develop up to ten high-quality fact sheets (using <br /> both community needs and best practices in bicycle Adobe Creative Suite) for priority projects that will <br /> ito! FEHRtPEERS <br />