Laserfiche WebLink
Pedestrian and Bicycle Master Plan Update for the City of Pleasanton <br /> include concept drawings, cost estimates, and a chapter of the plan, with a focus on the short- <br /> corresponding cost estimate. We will engage Mark range and long-range action plans <br /> Thomas & Company to prepare cost estimates for • Draft and final design guidelines and crosswalk <br /> projects requiring significant civil work, such as trails or policy appendices <br /> other complex projects. They will also provide input on <br /> constructability, phasing, and other civil-engineering- TASK 7.DRAFT AND FINAL PLAN <br /> related considerations for each project. Fehr& Peers will consolidate all of the interim <br /> Task 6.2 Safe Routes to School Plans deliverables described above into a comprehensive <br /> The 2010 Plan provides safe routes to school concept Plan Update document. The Master Plan Update will <br /> plans for several area schools. Under this task, we will be compliant with the Caltrans ATP requirements, <br /> work with the City to select up to three (3) schools for which supplant the former BTA requirements. <br /> which we will prepare either traffic control plans, walk 7.1 Administrative Draft Plan <br /> and roll to school maps, or safe routes to school We will combine all of the interim deliverables and <br /> concept plans. The project deliverables will vary by figures into a consolidated administrative draft Plan <br /> school community, so we have left this task flexible to update for initial City review. <br /> provide a deliverable that meets the needs of the local <br /> school community. 7.2 Public Review Draft Plan <br /> Based on one round of consolidated revisions from <br /> Task 6.3 Short-Range and Long-Range Action Plans City staff, we will prepare a public review draft of the <br /> The short-range and long-range action plans will Plan. We anticipate that the City will circulate this <br /> provide information regarding the applicability of version for public comment and to the commissions <br /> relevant funding sources and provide guidance on key and City Council for their review. <br /> next steps for the implementation of the Plan. It will 7.3 Commission Meetings <br /> also include provisions for facility cost monitoring, In support of the draft Plan, we will attend one <br /> facility maintenance, and facility security. The goal of additional commission meeting in support of the Plan <br /> the short-range action plan will be to provide discrete Update. This may be an additional BPTC meeting, <br /> steps for targeting City staff efforts and funding over <br /> the next five years. The long-range action plan will Planning Commission meeting, or City Council study <br /> focus on monitoring of longer-term performance session, at the discretion of City staff. <br /> measures and goals and how the City can work toward 7.4 Council Meeting <br /> those over the next five-year Plan update cycles. We will attend one Council meeting in support of the <br /> Task 6.4 Design Guidelines and Crosswalk Policy Plan Update. We anticipate this will be for Plan <br /> adoption. <br /> Under this task, we will provide the City with a <br /> consistent set of design guidelines for best practices in 7•5 Final Plan <br /> innovative bicycle and pedestrian design.A hallmark of Fehr& Peers will develop electronic and printed <br /> this chapter of the Plan will be the Crosswalk Policy. versions of the Plan Update for the City.We have <br /> This policy will provide consistency in the installation, assumed 10 printed copies of each of the draft and <br /> enhancement, and potential removal of marked final Master Plan document <br /> crosswalks citywide. TASK 7 DELIVERABLES <br /> TASK 6 DELIVERABLES • Draft and final presentation materials and <br /> • Draft and final cut sheets, including concepts plans attendance at the Commission and Council <br /> and cost estimates, for the up to ten (10) priority meetings <br /> projects • Administrative draft plan, public draft Plan based <br /> • Draft and final safe routes to school deliverables on one round of consolidated comments, and a <br /> for up to three (3)school sites (either traffic final plan based on one round of consolidated <br /> control plan,walk and roll map, or concept plan) comments <br /> • Draft and final funding and implementation <br /> • <br /> FEHRtPEERS 11 <br />