Laserfiche WebLink
16. In accordance with Climate Action Plan Measure TDM1-6, the applicant shall convert a <br /> parking space within the north phase to include an electric vehicle charging station upon <br /> request by a resident. The subterranean garage shall include provisions (e.g. empty <br /> conduits) for any future electric vehicle charging needs. Plans submitted to the Building <br /> and Safety Division shall demonstrate compliance with this measure and are subject to <br /> the review and approval of the Director of Community Development. <br /> 17. In accordance with Climate Action Plan Measure EC1-2, the project shall meet the City's <br /> residential green rating standard and incorporate shade trees, light-colored roofing, or <br /> energy efficient landscaping lighting. Alternative measures may be proposed and are <br /> subject to the review and approval of the Director of Community Development. <br /> 18. In accordance with Climate Action Plan Measure EC1-3, the project shall provide <br /> parking lot shade trees. Plans submitted to the Building and Safety Division shall <br /> demonstrate compliance with this measure and are subject to the review and approval of <br /> the Director of Community Development. <br /> 19. In accordance with Climate Action Plan Measure EC4-4, the project shall incorporate <br /> solar tubes, skylights, or other daylighting systems in the proposed buildings, as <br /> determined by the Director of Community Development. Said systems shall be identified <br /> on plans submitted to the Building and Safety Division for permits and are subject to the <br /> review and approval of the Director of Community Development. <br /> 20. In accordance with Climate Action Plan Measure ER2-3, the project shall incorporate <br /> distributed generation into the project (e.g., one of the following: photovoltaic, solar <br /> thermal, solar hot water, or solar cooling), and/or provide bloom box or other fuel cell <br /> technologies. Said measure(s) shall be identified on plans submitted to the Building and <br /> Safety Division for permits. <br /> 21. In accordance with Climate Action Plan Measure ER2-5, the project shall include <br /> provisions for the ability to adapt electric vehicle (EV) charging stations to a solar grid. <br /> Plans submitted to the Building and Safety Division shall demonstrate compliance with <br /> this measure and are subject to the review and approval of the Director of Community <br /> Development. <br /> 22. In accordance with Climate Action Plan Measure SW2-12, the project shall incorporate <br /> adequate space and logistics for handling of recyclable and compostable materials. <br /> Plans submitted to the Building and Safety Division shall demonstrate compliance with <br /> this measure and are subject to the review and approval of the Director of Community <br /> Development. <br /> 23. In accordance with Climate Action Plan Measures WA1-7 and WA1-8, the project shall <br /> incorporate a water-saving landscape plan that includes xeriscaping and drought- <br /> tolerant planting instead of lawns. Plans submitted to the Building and Safety Division <br /> for permits shall include a final planting plan that incorporates this measure. <br /> 24. In accordance with Climate Action Plan Measure WA3-2, the project shall utilize <br /> reclaimed wastewater for irrigation. Plans submitted to the Building and Safety Division <br /> shall demonstrate compliance with this measure and are subject to the review and <br /> approval of the Director of Community Development. <br /> 5 <br />