My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
081815
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:39:04 AM
Creation date
8/11/2015 3:45:53 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/18/2015
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> On April 28, 2010, the Planning Commission recommended approval of a PUD <br /> application by Dr. William and Lydia Yee to create four buildable single-family custom <br /> home lots. <br /> On June 1, 2010, City Council approved PUD-87-19-03M to allow four buildable single- <br /> family custom home lots on Parcel 1 of Parcel Map 3692 (an approximately 29.82-acre <br /> site). The property is located on the west side of Foothill Road, south of Oak Creek <br /> Drive. <br /> On January 6, 2011, the Staff Review Board, acting within their authority, approved a <br /> minor subdivision application by Dr. William and Lydia Yee to subdivide 4100 Foothill <br /> Road into four lots. <br /> PUD-87-19-03M provides for the construction of the subdivision in three phases. As <br /> allowed by the Subdivision Map Act and the Pleasanton Municipal Code, the developer <br /> elected to initially construct Phases 1 and 2 prior to requesting approval of the parcel <br /> map. Phases 1 and 2 include subdivision improvements serving two (Lots 1 and 2) of <br /> the four proposed lots. The Phase 1 and 2 improvements have been constructed per <br /> the project improvement plans that were reviewed by City staff, approved by the City <br /> Engineer, and prepared in compliance with the approved Vesting Tentative Parcel Map. <br /> Phase 3 of the project, which includes Lots 3 and 4, will be constructed sometime in the <br /> future. <br /> All subdivision improvements serving the two proposed lots (Lots 1 and 2) have been <br /> constructed. The developer has requested City Council acceptance of the public <br /> improvements and has submitted a parcel map to create Lots 1 and 2. The parcel map <br /> is currently under review by staff and will be recorded following the City Engineer's <br /> approval of the map, as authorized by the Municipal Code. At some later time, the <br /> development will undertake Phase 3 of the project. At that time, another parcel map will <br /> be recorded to create Lots 3 and 4. <br /> DISCUSSION <br /> Completed Public Improvements <br /> The driveway, access gate, and utilities including, but not limited to, electric power to <br /> access the gate, landscaping and lighting near the access gate, and the existing <br /> sanitary sewer main along the driveway, shall be private. These improvements will be <br /> maintained by the property owners within the Vesting Tentative Parcel Map area and <br /> the property owners on the west side of the subdivision, who have access rights to the <br /> private driveway and rights to use the private sanitary sewer main, as per a recorded <br /> maintenance agreement. <br /> The onsite improvements include bioswales that were constructed to mitigate storm <br /> water runoff required by the San Francisco Bay Region Municipal Regional Stormwater <br /> NPDES Permit. The storm drain improvements and storm water treatment areas <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.