My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
072115
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:45:42 AM
Creation date
7/14/2015 3:56:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/21/2015
DESTRUCT DATE
15Y
DOCUMENT NO
9
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bid <br />Items of Work <br />Base <br />Gateway Feature at the off ramp and median <br />Cobble Paving along Bernal under 1-680 <br />Erosion Control <br />Irrigation Backbone <br />Mulch <br />Bernal Median Curb Replacement <br />Additive 1 <br />Tree Planting & Irrigation at Loop Off Ramp <br />Soil Preparation Maintenance <br />Additive 2 <br />Planting and Irrigation at Bernal Gateway Median <br />Soil Preparation <br />Maintenance <br />Additive 3 <br />Planting and Irrigation for All Areas <br />Soil Preparation <br />Maintenance <br />Staff recommends awarding the base bid construction contract to Cleary Brothers <br />Landscape, Inc. as well as Additive 1 and Additive 2. <br />DISCUSSION <br />Construction Bids <br />Sealed bids for this project were opened on June 23, 2015. There were three bids <br />received, and they ranged from the low base bid amount of $816,612. to $932,235, as <br />compared to the engineer's estimate of $900,000 for the project (see Attachment 2 for <br />Bid Summary). <br />Per project documents, the ranking of the bid for project award purposes is based on <br />the lowest of the base bid items. The low base bid of $816,612.52 was received from <br />Cleary Brothers Landscape, Inc. of Danville, California. Cleary Brothers bid for Additive <br />Bid 1 is $25,325 and $46,095 for Additive Bid 2. Staff recommends that the <br />construction contract be awarded to the lowest responsible base bidder. Staff also <br />recommends including Additive Bid 1 and Additive Bid 2 to the construction contract, <br />making a total contract amount of $888,032.52. Past work performed by Cleary Brothers <br />Landscape, Inc. was verified to be satisfactory. Therefore, staff recommends award of <br />the construction contract to the lowest responsible bidder, Cleary Brothers Landscape, <br />Inc. <br />Seventh Amendment to the Professional Services Agreement with BKF Engineers: <br />In September 2010, City Council approved a Professional Services Agreement with <br />BKF Engineers to prepare plans, specifications and estimates (PS &E) and <br />environmental documentation for the Bemal Avenue at 1 -680 Improvement Project. <br />Caltrans requires a Historic Compliance Report outlining a testing and monitoring <br />program for archaeologically sensitive areas. Preparing this report is additional work <br />that was not included in the original scope of services. BKF Engineers' sub - consultants <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.