My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:51:41 AM
Creation date
6/12/2015 11:15:39 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
8
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TJC will provide input to 2 design clarifications <br /> • JDH Corrosion Consultants will provide/ design clarifications <br /> • Jacobs Associates will provide input to 1 design clarification on general pipeline sections <br /> • Scope is limited to the level of effort in the budget. <br /> Deliverables: <br /> • Written design clarifications on RMC standard design clarification response template <br /> (.pdf format via email) as well as any associated design documents. <br /> Task 6.2—Horizontal Directional Drilling Clarifications <br /> RMC and it sub consultant team prepare up to 4 design clarifications to further clarify and/or <br /> amend the contract documents and design intent. This task also includes contract change order <br /> documentation that may be required. The level of effort assumes that administrative (non- <br /> technical) requests for design clarification which do not involve design intent will be answered <br /> by the Resident Engineer and/or City staff. <br /> Assumptions: <br /> • RMC will provide up to 2 design clarifications at an average effort of 4 hours each (QC is <br /> included in Task 1. <br /> • Jacobs Associates will provide input to 2 design clarification <br /> Deliverables: <br /> • Written design clarifications on RMC standard design clarification response template <br /> (.pdf format via email) as well as any associated drawings and specifications. <br /> Task 6.3—Flow Control Station Clarifications <br /> RMC and it sub consultant team will prepare up to 2 design clarifications to further clarify and/or <br /> amend the contract documents and design intent. This task also includes contract change order <br /> documentation that may be required. The level of effort assumes that administrative (non- <br /> technical) requests for design clarification which do not involve design intent will be answered <br /> by the City or its CM (and Resident Engineer). <br /> Assumptions: <br /> • RMC will provide up to 2 design clarifications at an average effort of 4 hours each (QC is <br /> included in Task 1) <br /> • TJC and Associates will provide input to 2 design clarifications <br /> Deliverables: <br /> • Written design clarifications on RMC standard design clarification response template <br /> (.pdf format via email) as well as any associated drawings and specifications. <br /> Task 7—Acceptance Testing Support <br /> Task 7.1 — Pipeline Testing <br /> RMC will support the Resident Engineer and City staff in coordinating and reviewing plans and <br /> results from pipeline testing and flushing required for acceptance of the construction project. <br /> Scope of Work 6 March 30,2015 <br /> Recycled Water Infrastructure Expansion—Phase 1A <br /> Engineering Services During Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.