Laserfiche WebLink
SCOPE OF SERVICES <br /> PARKS—Landscape Services (Irrigation, Planting and General Construction) <br /> Contractor Name: Suarez & Munoz Const., Inc. Signature: .tit A�s • <br /> The City is requesting an experienced and licensed, (C-27 required) contractor to perform routine landscape <br /> construction, playground apparatus installation, and renovation work in the City parks and street median areas <br /> on an as-needed basis. All work is to be performed to current City Standards and Specifications dated January <br /> 2011. Rates are to be on-site productive time only and are to include any clean up and disposal costs due to <br /> work. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callout <br /> Foreperson $70 $93 $111 $111 <br /> Operator $76 $98 $115 $115 <br /> Laborer/Pipe Layer $65 $86 $102 $102 <br /> Truck Driver $65 $86 $102 $102 <br /> Construction Laborer $ss $86 $102 $102 <br /> Light Carpentry $90 $124 $1 so $150 <br /> Concrete Finisher $73 $sa $117 $117 <br /> $ $ $ $ <br /> Contractor's Equipment <br /> Equipment Size& Description Hourly <br /> Rate <br /> Skid Steer Loader Bobcat 5300 • $32 <br /> Excavator Bobcat 331C Mini Excavator $32 <br /> Backhoe Loader CAT 420 $43 <br /> Truck&Tools Full Size Pickup with Tools $20 <br /> Compressor w/Tools 100 GEM Diesel w/Jackhammer $50 <br /> Wacker Jumping Jack Tamper(gas) $15 <br /> Pumps 2"Submersible pump $30 <br /> Arrow Board Solar Powered,Trailer Mount $5 <br /> Traffic Cones 71b,28" $0.25 <br /> Barricades Standard Barricade without light $0.50 <br /> Dump Truck 10 Wheel International Dump Truck $60 <br /> Concrete/Asphalt 10" Walk Behind Saw $50 <br /> Saw <br /> Misc. Tools Included in Pickup Truck Rate $Included <br /> Bobtail Dump Truck 5 CY International Bobtail Dump Truck $34.00 <br /> Percent of mark-up on material: 5 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: 15 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr.X 1 Hr. Increments (Select one) <br /> 45IPage <br /> [SLEAS.ANTON. <br />