My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2015
>
061615
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2015 11:52:39 AM
Creation date
6/9/2015 4:09:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/16/2015
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br /> PARKS - Concrete, Paver Repair and Installation <br /> Contractor Name: Suarez & Munoz CQnst., Inc. Signature: =IVoi■ <br /> See City Standards and Specifications for exact specifications for concrete and paver work. All concrete <br /> installation shall have a Broom Finish. <br /> 1. Remove and install replacement section of concrete, to include root pruning and grinding <br /> Area less than 1,000 square feet $73 cost per square foot <br /> Area larger than 1,000 square feet $11 cost per square foot <br /> 2. Install a new section of concrete, including base material <br /> Area less than 1,000 square feet $12 cost per square foot <br /> Area larger than 1,000 square feet $10 cost per square foot <br /> 3. Remove and replace a section of brick pavers, to include root pruning and grinding <br /> Area less than 1,000 square feet $19 cost per square foot <br /> Area larger than 1,000 square feet $17 cost per square foot <br /> 4. Install all new brick pavers, including basic paver and base material to depth of 3" For bid purposes, <br /> assume paver is 5"x 8" Plaza Stone Rectangle Paver, model 100002963; available at Home Depot. <br /> Area less than 1,000 square feet $21 cost per square foot <br /> Area larger than 1,000 square feet $19 cost per square foot <br /> Percent of mark-up on material: 15 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: 15 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200)= $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr.X 1 Hr. Increments (Select one) <br /> 44 I i u <br /> ['Lf ASANTON. <br />
The URL can be used to link to this page
Your browser does not support the video tag.