Laserfiche WebLink
SCOPE OF SERVICES <br /> PARKS - Trail Construction Services <br /> Contractor Name: Suarez & Munoz Const., Inc Signature: v� �1 T - <br /> The City is requesting an experienced and licensed contractor to perform natural surface trail construction/repair on an as- <br /> needed basis. Contractor shall be experienced in constructing both trails and trail design elements to the specifications and <br /> details from the U. S. Forest Service's "National Trails Drawings and specifications (EM-7720-103) Sept. 1996" available <br /> at www.fs.fed.us/.ftproot/pub/acad/dev/trails/trails.htrn. <br /> Contractor's Labor rates (Hourly) <br /> Position Description Regular Overtime Sunday Emergency <br /> Callout <br /> Foreperson $70 $93 $111 $111 <br /> Operator $76 $98 $115 $115 <br /> Truck Driver $65 $86 $102 $102 <br /> Laborer $65 $86 $102 $102 <br /> Contractor's Equipment <br /> Equipment Size & Description Hourly <br /> Rate <br /> Excavator Bobcat 331C Mini Excavator $32 <br /> Skid Steer Loader Bobcat 5300 with Tracks $32 <br /> Truck w/Hand Tools Full Size Pickup with Tools $20 <br /> Wacker Jumping Jack Tamper(gas) $15 <br /> Traffic Cones 71b,28" $0.25 <br /> Dump Truck 10 Wheel International Dump Truck $60 <br /> Compressor w/Tools 100 CFM Diesel w/Jackhammer $50 <br /> Traffic Cones 71b.,28" $0.25 <br /> Misc. Tools Included in Pickup Truck Rate $Includet`] <br /> Bobtail Dump Truck 5 CY International Bobtail Dump Truck $34 <br /> Percent of mark-up on material: 1 5 % Percent Mark-up on invoicing must be demonstrated as a <br /> percentage. Example: Material $1,000 + 10% ($100) = $1,100 <br /> Percent of mark-up on outside equipment: 1 5 % (equipment pre-approved by the City). Mark-up on <br /> invoicing must be demonstrated as a percentage. Example: Outside Equipment $2,000 + 10% ($200) = $2,200 <br /> Billing of hours of work will be by 1/4 Hr. 1/2 Hr.X 1 Hr. Increments (Select one) <br /> 48IPa ? e <br /> M1N'J <br /> ('LEAS.ANTON.. <br />