replacing existing expansion joint seals at Piers 2, 3 and 4, and repairing <br /> exposed reinforcement on the bridge deck. <br /> 3) Valley Avenue Bridge at Arroyo Del Valle (Br No. 33C-0411): The scope of work <br /> for this bridge includes applying methacrylate deck treatment and repairing spalls <br /> on the concrete barrier rail. <br /> 4) Hopyard Road Bridge at Arroyo Mocho - Left (Br No. 33C-010114 The scope of <br /> work for this bridge includes applying methacrylate deck treatment, removing and <br /> replacing an existing expansion joint seal at Pier 2, and repairing spalls on the <br /> concrete barrier rail. <br /> 5) Hopyard Road Bridge at Arroyo Mocho - Right (Br No. 33C-0101R): The scope of <br /> work for this bridge includes applying methacrylate deck treatment and repairing <br /> spalls on the concrete barrier rail. <br /> 6) Stoneridge Drive Bridge at Arroyo Mocho (Br No. 33C-0410): The scope of work <br /> for this bridge includes removing and replacing existing expansion joint seals at <br /> Piers 2 and 3, replacing expansion dam at Pier 3, and repairing spalls on the <br /> concrete barrier rail. <br /> 7) W. Las Positas Boulevard Bridge at Tassajara Creek (Br No. 33C-0436): The <br /> scope of work for this bridge includes repairing spalls around the drainage hole <br /> located at the centerline of Abutment 4, repairing spalls at the Pier 3 support, and <br /> repairing spalls at the wingwall culvert joint at the northeast and southwest <br /> corners of the bridge. <br /> Due to the specialty inspection services required for the bridge preventative maintenance <br /> projects, retention of an inspection services firm is necessary. Staff contacted our as- <br /> needed general engineering consultants and found that Pakpour Consulting Group, Inc. <br /> had experience working on similar projects with their subcontractor The Hanna Group. <br /> After reviewing the proposal and interviewing the inspection team, staff recommends the <br /> approval of the task authorization ($90,900) for Pakpour/Hanna Group to perform <br /> construction support services. <br /> The I-680/Bernal Interchange Landscaping Improvements project is scheduled to be <br /> awarded July 21, 2015. The project is within the Caltrans Right of Way and requires <br /> Caltrans-experienced inspection staff to meet the requirements of a Caltrans <br /> Encroachment Permit. The proposed inspection staff has the required Caltrans <br /> experience and can provide the construction support services for both projects. Since <br /> the two projects will be overlapping and each project does not require full time inspection, <br /> inspection costs can be reduced by using the same firm to inspect both projects. Staff <br /> recommends the award of the first task for the seven bridges at this time and the second <br /> task to be awarded with award of the landscaping project. <br /> In addition to specialty inspection, the construction phase will require the design engineer <br /> BCA to provide as-needed construction support services to review technical shop <br /> drawings and answer requests for information. An additional task authorization of <br /> Page 3 of 5 <br />