Laserfiche WebLink
Kimley>>>Horn <br /> In addition, Kimley-Horn's subconsultant, Bellecci and Associates, Inc., will update their previous joint <br /> trench improvement plans and Form B from 2011, in conjunction with the Stanley Boulevard improvement <br /> plans. <br /> Kimley-Horn will follow a structured QA/QC process that will be implemented throughout the life of the <br /> design project.We have designated a senior roadway engineer to perform independent reviews ahead of <br /> major submittals(100%, and Final). <br /> Sub-Task A:Prepare 75%Estimate <br /> At approximately the 75%design level, Kimley-Hom will submit the engineer's opinion of <br /> probable costs(OPCC)to the City for budgeting purposes. Plans and specifications will not be <br /> submitted under this effort. <br /> We assume 44 hours of effort for this sub-task to develop the 75% estimate, <br /> Deliverables: <br /> e 75% Opinion of Probable Construction Cost(PDF format) <br /> Sub-Task B:Prepare 100%PS&E <br /> Kimley-Hom will develop 100% plans, specifications, and estimates of probable construction cost. <br /> Plans will be prepared at a scale of 1"=20' (or other appropriate scale) in imperial unit format. <br /> Design will include horizontal and vertical layout of the proposed improvements. We assume that <br /> there will be no changes to the vertical design of the control line profile from the previous 90% <br /> design plans submitted to the City in 2008. Any changes to the vertical design will constitute <br /> additional services and upon authorization, can be performed on a time and materials basis. <br /> Underground utilities are assumed to remain in their present locations. No additional storm drain <br /> design is included except for connections to the existing storm drainage system and underdrain <br /> system under the swale. Some vertical adjustments to manhole and other utility covers or lids in <br /> the roadway and sidewalks may be necessary. <br /> As discussed with the City, no irrigation will be provided for the plants in the swale areas. As <br /> there will be no irrigation for the swales, City will provide Kimley-Horn with plant species and <br /> technical specifications for the plants, <br /> The following is an estimated plan sheet breakout: <br /> Cover 1 Sheet <br /> Typical Sections 2 Sheets <br /> Horizontal Control 1 Sheet <br /> Demolition Plans 2 Sheets <br /> Plan and Profile Plans 4 Sheets <br /> Construction Details 6 Sheets <br /> Drainage/Utility 6 Sheets <br /> Pavement Marking and Signing Plans 3 Sheets <br /> Street Lighting Plans 2 Sheets <br /> Signal Modification Plans(2 signals) 4 Sheets <br /> Joint Trench Plans By others <br /> Estimated Total Sheets: 31 Sheets+Joint Trench Sheets <br /> k ey hOfn coi 6150`Stonendge Mall Road, Suite 200, Pleasanton, CA 94588 995,-398'4840 <br /> 3 <br />