Kimley>>>Horn <br /> Concrete coring services to determine the composition, thickness, and reinforcing of existing concrete <br /> slab within the roadway to be removed are not included in our scope of services and can be performed as <br /> an additional service. <br /> Kimley-Horn subconsultant, LCC, Inc.,will perform ground topographic survey at selected locations and <br /> right-of-way mapping at the project location in Pleasanton, in the approximate location as described in the <br /> Project Understanding to assist in the civil, traffic signal, utility, and signing and striping designs. It is <br /> assumed that LCC will supplement the existing topographic survey with additional ground survey and <br /> utilize the same horizontal and vertical control. The survey will not locate, set or reset any monuments. <br /> Record of survey and boundary survey are specifically excluded from this scope of service. <br /> Bellecci and Associates will update their joint trench and Form B design from 2011 as part of this <br /> contract. <br /> Task 3—Conceptual Design <br /> Kim ley-Hom will provide conceptual design of the Stanley Boulevard improvements based on the City <br /> Plan Line Markup dated December 2, 2014 and the comments received at the meeting on January 13, <br /> 2015. The design changes include the following: <br /> -Increasing the proposed sidewalk width on both north and south sides from 4'to 6'due to street <br /> being classified as an arterial. <br /> -Reducing the north side parking lane from 8'to 7'. <br /> -Increasing the north side bike lane from 5'to 6'. <br /> -Reducing the north side vehicular travel lane from 14'to 13' between Stations 10+00 to19+50. <br /> -Modifying the lane width around the new median island between Stations 25+60 to 26+75. <br /> -Adding curb retum bulb outs on the north side of Stanley at Del Valle Court and Rachael Way. <br /> Kimley-Hom will perform the Conceptual Design factoring in the existing conditions, recently constructed <br /> improvements, the City's Pedestrian and Bicycle Master Plan, and the proposed electrical <br /> undergrounding work by Bellecci and Associates. Kimley-Horn will provide the Conceptual Design for <br /> review by the City based on the above direction. Any minor changes requested by the City following <br /> review will be considered and incorporated into the 100% PS&E package. Any additional changes or <br /> concept revisions and submittals may be considered additional services. <br /> We assume 74 hours of effort for this task. The Conceptual Design will be presented on exhibit sheets <br /> that will include design annotation to aid in review and acceptance of the proposed conceptual design. <br /> Proposed elevations and surfaces will not be fully designed at this level, but will be conceptually <br /> considered for feasibility of proposed features. <br /> Kimley-Hom will also coordinate the civil design with Bellecci and Associates on the location of the joint <br /> trench, vaults, and other appurtenances related to the utility undergrounding project. <br /> Deliverables: <br /> • Three (3)full size (24"x 36") of the Conceptual Design <br /> • One (1) large format plot of Conceptual Design in color <br /> • Electronic(PDF)copy of Conceptual Design <br /> Task 4—Plans,Specifications,& Estimates(PS&E) <br /> Kimley-Hom will prepare plans, technical specifications, and engineer's opinion of probable costs based <br /> on the City Approved Conceptual Design. <br /> •`kimleyhorn coral 6150 Stoneridge Mall Road, Suite,200, Pleasanton -CA94588. 925 398 4840 <br /> 2 <br />